Back to results

University of Southern Mississippi

Evaluation of Natural Remediation Following the Occurrence of a Construction-Related Sediment Plume at Camp Shelby Training Site, Mississippi

Abstract

dc:description.abstract

<p>This study is a comprehensive look into the response and recovery of an anthropogenic induced sediment infill of a bottom land hardwood wetland at Camp Shelby Training Site (CSTS) in Perry and Forrest Counties, Mississippi. Lack of sediment control structures (sediment fences and matting), combined with high rainfall, led to erosion within and around the Multi Purpose Range Complex-Heavy (MPRC-H) during its construction. Deposition of sediment effected approximately 20.2 hectares of wetlands that have been monitored since the event occurred in 2005. To better understand the recovery process, the study area was compared to the Cypress Creek Mitigation Area (CCMA) that has similar, but natural environmental characteristics. Groundwater geochemistry and infiltration rates were measured and compared to determine the effects of the sediment in fill on the MPRC-H wetland. The geochemical results show increases an in the MPRC-H wetlands with the elements: calcium, manganese, silica, sodium, and sulfur. The infiltration measurements for the CCMA have an average rate of 12.45 mm/hr with the MPRC-H wetland infiltration rates averaging 2.7 mm/hr. The data also reveal that three major wetland functions were disrupted due to the infill: 1) the ability to retain minor and trace elements, 2) maintaining subsurface hydrology, 3) and the ability to slow and retain floodwaters. The plume was remapped in 2009 to compare to the 2005 plume and there was a 39% decrease in aerial extent due to natural erosional processes. In 2005, the average plume thickness was 6.4 cm, and by 2009 that amount had changed to 2.7 cm, which is a 30% decrease. These data will enable wetland managers and scientists to better understand the impact of sediment infill and how they translate to the decrease or increase in wetland function.</p>

Degree

thesis:*
Name thesis:degree_name
Master of Science (MS)
Level thesis:degree_level
Masters Thesis
Discipline thesis:degree_discipline
Geography and Geology
Year dc:date.available
2010

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Floyd, Ian Eli
Contributors dc:contributor
  • David Patrick
  • Frank Heitmuller
  • Maurice Meylan

Identifiers

dc:identifier.*
Repository record dc:identifier
https://aquila.usm.edu/masters_theses/460
OAI identifier oai:identifier
oai:aquila.usm.edu:masters_theses-1548

Chain of custody

source
Harvested from
University of Southern Mississippi
Base URL
aquila.usm.edu/do/oai/
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
related terms
citation

Floyd, Ian Eli. Evaluation of Natural Remediation Following the Occurrence of a Construction-Related Sediment Plume at Camp Shelby Training Site, Mississippi. Masters Thesis thesis, 2010. https://aquila.usm.edu/masters_theses/460