{"id":{"repo_id":"usfca","oai_identifier":"oai:repository.usfca.edu:capstone-1059"},"canonical_url":"https://search.dev.ndltd.org/etd/usfca/oai:repository.usfca.edu:capstone-1059","repository":{"repo_id":"usfca","name":"University of San Francisco","base_url":"https://repository.usfca.edu/do/oai/"},"display":{"title":"Emergency Preparedness on an Inpatient Hospital Unit","abstract":"<p>This paper will discuss the implementation of an emergency preparedness quality improvement project conducted by a University of San Francisco Clinical Nurse Leader (CNL) student on an inpatient cardiac unit, Unit H, at an urban teaching hospital in Northern California, Hospital B. An assessment of the current state of emergency preparedness, a diagnosis of Unit H’s area of greatest needs, the details of planning and implementing the quality improvement as well as the final evaluation will be discussed. The nursing process will be used for the structure of this paper as it was used as the structure of this project. This structure aligns with and was implemented with the change theories of Kurt Lewin and Ronald Lippitt (see Appendix A; Mitchell, 2013). The results of this project included an overall increase in Unit H’s nurses’ feeling of preparedness as well as bringing Unit H’s Emergency Action Plan and equipment into compliance with Hospital B’s policies and Joint Commission standards.<strong></strong></p>","abstract_html":"&lt;p&gt;This paper will discuss the implementation of an emergency preparedness quality improvement project conducted by a University of San Francisco Clinical Nurse Leader (CNL) student on an inpatient cardiac unit, Unit H, at an urban teaching hospital in Northern California, Hospital B. An assessment of the current state of emergency preparedness, a diagnosis of Unit H’s area of greatest needs, the details of planning and implementing the quality improvement as well as the final evaluation will be discussed. The nursing process will be used for the structure of this paper as it was used as the structure of this project. This structure aligns with and was implemented with the change theories of Kurt Lewin and Ronald Lippitt (see Appendix A; Mitchell, 2013). The results of this project included an overall increase in Unit H’s nurses’ feeling of preparedness as well as bringing Unit H’s Emergency Action Plan and equipment into compliance with Hospital B’s policies and Joint Commission standards.&lt;strong&gt;&lt;/strong&gt;&lt;/p&gt;","abstract_has_math":false,"creators":["Barnes, Hailee Marie"],"institution":null,"degree_name":"Master of Science in Nursing (MSN)","degree_level":"Project/Capstone - Global access","degree_discipline":null,"degree_department":null,"school":null,"contributors":["T. Gallo"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-12-12T08:00:00Z","date_published":"2014-12-12T08:00:00Z","updated_at":"2026-07-24T05:42:56Z","subjects":["Emergency Preparedness","Nursing","Emergency Management","Nurse Education","Critical Care Nursing","Other Nursing"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"https://repository.usfca.edu/capstone/55","outbound_label":"Repository record","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["T. Gallo"]},{"key":"dc:creator","label":"Author","values":["Barnes, Hailee Marie"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2014-11-30T08:00:00Z"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Project/Capstone - Global access"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Nursing (MSN)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Emergency Preparedness","Nursing","Emergency Management","Nurse Education","Critical Care Nursing","Other Nursing"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.usfca.edu/capstone/55"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>This paper will discuss the implementation of an emergency preparedness quality improvement project conducted by a University of San Francisco Clinical Nurse Leader (CNL) student on an inpatient cardiac unit, Unit H, at an urban teaching hospital in Northern California, Hospital B. An assessment of the current state of emergency preparedness, a diagnosis of Unit H’s area of greatest needs, the details of planning and implementing the quality improvement as well as the final evaluation will be discussed. The nursing process will be used for the structure of this paper as it was used as the structure of this project. This structure aligns with and was implemented with the change theories of Kurt Lewin and Ronald Lippitt (see Appendix A; Mitchell, 2013). The results of this project included an overall increase in Unit H’s nurses’ feeling of preparedness as well as bringing Unit H’s Emergency Action Plan and equipment into compliance with Hospital B’s policies and Joint Commission standards.<strong></strong></p>"]},{"key":"dc:title","label":"Title","values":["Emergency Preparedness on an Inpatient Hospital Unit"]}]}],"canonical_facts":{"dc:contributor":["T. Gallo"],"dc:creator":["Barnes, Hailee Marie"],"dc:date.available":["2014-11-30T08:00:00Z"],"dc:description.abstract":["<p>This paper will discuss the implementation of an emergency preparedness quality improvement project conducted by a University of San Francisco Clinical Nurse Leader (CNL) student on an inpatient cardiac unit, Unit H, at an urban teaching hospital in Northern California, Hospital B. An assessment of the current state of emergency preparedness, a diagnosis of Unit H’s area of greatest needs, the details of planning and implementing the quality improvement as well as the final evaluation will be discussed. The nursing process will be used for the structure of this paper as it was used as the structure of this project. This structure aligns with and was implemented with the change theories of Kurt Lewin and Ronald Lippitt (see Appendix A; Mitchell, 2013). The results of this project included an overall increase in Unit H’s nurses’ feeling of preparedness as well as bringing Unit H’s Emergency Action Plan and equipment into compliance with Hospital B’s policies and Joint Commission standards.<strong></strong></p>"],"dc:identifier":["https://repository.usfca.edu/capstone/55"],"dc:subject":["Emergency Preparedness","Nursing","Emergency Management","Nurse Education","Critical Care Nursing","Other Nursing"],"dc:title":["Emergency Preparedness on an Inpatient Hospital Unit"],"thesis:degree_level":["Project/Capstone - Global access"],"thesis:degree_name":["Master of Science in Nursing (MSN)"]},"updated_at":"2026-07-24T05:42:56Z"}