{"id":{"repo_id":"unlv","oai_identifier":"oai:oasis.library.unlv.edu:rtds-2436"},"canonical_url":"https://search.dev.ndltd.org/etd/unlv/oai:oasis.library.unlv.edu:rtds-2436","repository":{"repo_id":"unlv","name":"University of Nevada - Las Vegas","base_url":"https://oasis.library.unlv.edu/do/oai/"},"display":{"title":"Framework for a system to model casino development","abstract":"The purpose of this study is to develop a system to model casino development without the user's need for information from architects, contractors or consultants. The target user would be a casino executive who had business experience, but minimal real estate development experience. Successful modeling would be based upon a favorable ratio of developmental costs to income projections known as Return on Investment (ROI). In this study factors used to calculate ROI for casino development projects were analyzed by examination of actual ROI calculations that were previously performed by experienced casino executives who had support from architect, contractors and consultants. The analysis started with the mathematical equations of ROI calculations and with identifying the key elements that led to the ROI projections. The factors were all carefully studied and detailed information was determined that was used to establish a system framework. The process to determine developmental costs and income projections was identified and illustrated through the creation of Data Flow Diagrams. Research determined that the system needed two distinct subsections. The first sub-system, a business system, would need to generate a complete set of financial statements. The second sub-system, a construction developmental system, would need to be capable of processing a complete detailed project budget. This information was used to create a basic simulation system for a framework to model casino development. The study provides a concept, plan and framework for future research and building of a fully functioning system.","abstract_html":"The purpose of this study is to develop a system to model casino development without the user&#x27;s need for information from architects, contractors or consultants. The target user would be a casino executive who had business experience, but minimal real estate development experience. Successful modeling would be based upon a favorable ratio of developmental costs to income projections known as Return on Investment (ROI). In this study factors used to calculate ROI for casino development projects were analyzed by examination of actual ROI calculations that were previously performed by experienced casino executives who had support from architect, contractors and consultants. The analysis started with the mathematical equations of ROI calculations and with identifying the key elements that led to the ROI projections. The factors were all carefully studied and detailed information was determined that was used to establish a system framework. The process to determine developmental costs and income projections was identified and illustrated through the creation of Data Flow Diagrams. Research determined that the system needed two distinct subsections. The first sub-system, a business system, would need to generate a complete set of financial statements. The second sub-system, a construction developmental system, would need to be capable of processing a complete detailed project budget. This information was used to create a basic simulation system for a framework to model casino development. The study provides a concept, plan and framework for future research and building of a fully functioning system.","abstract_has_math":false,"creators":["Mammina, Benjamin Harold"],"institution":"University of Nevada, Las Vegas","degree_name":"Master of Engineering (ME)","degree_level":"Thesis","degree_discipline":"Civil and Environmental Engineering","degree_department":null,"school":null,"contributors":["Moses Karakouzian"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2002,"date_issued":"2002-01-01T08:00:00Z","date_published":"2002-01-01T08:00:00Z","updated_at":"2026-07-24T05:25:26Z","subjects":[],"languages":["English"],"rights":["IN COPYRIGHT. For more information about this rights statement, please visit http://rightsstatements.org/vocab/InC/1.0/"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["https://oasis.library.unlv.edu/rtds/1437"],"render_values":[{"text":"https://oasis.library.unlv.edu/rtds/1437","href":"https://oasis.library.unlv.edu/rtds/1437","code":true}]}]},"links":{"outbound_url":"https://doi.org/10.25669/py7b-yu0r","outbound_label":"DOI","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Moses Karakouzian"]},{"key":"dc:creator","label":"Author","values":["Mammina, Benjamin Harold"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:publisher","label":"Institution","values":["University of Nevada, Las Vegas"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil and Environmental Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Engineering (ME)"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["IN COPYRIGHT. For more information about this rights statement, please visit http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["10.25669/py7b-yu0r","https://oasis.library.unlv.edu/rtds/1437","https://oasis.library.unlv.edu/context/rtds/article/2436/viewcontent/uc.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this study is to develop a system to model casino development without the user's need for information from architects, contractors or consultants. The target user would be a casino executive who had business experience, but minimal real estate development experience. Successful modeling would be based upon a favorable ratio of developmental costs to income projections known as Return on Investment (ROI). In this study factors used to calculate ROI for casino development projects were analyzed by examination of actual ROI calculations that were previously performed by experienced casino executives who had support from architect, contractors and consultants. The analysis started with the mathematical equations of ROI calculations and with identifying the key elements that led to the ROI projections. The factors were all carefully studied and detailed information was determined that was used to establish a system framework. The process to determine developmental costs and income projections was identified and illustrated through the creation of Data Flow Diagrams. Research determined that the system needed two distinct subsections. The first sub-system, a business system, would need to generate a complete set of financial statements. The second sub-system, a construction developmental system, would need to be capable of processing a complete detailed project budget. This information was used to create a basic simulation system for a framework to model casino development. The study provides a concept, plan and framework for future research and building of a fully functioning system."]},{"key":"dc:format","label":"Dc Format","values":["pdf"]},{"key":"dc:title","label":"Title","values":["Framework for a system to model casino development"]}]}],"canonical_facts":{"dc:contributor":["Moses Karakouzian"],"dc:creator":["Mammina, Benjamin Harold"],"dc:description.abstract":["The purpose of this study is to develop a system to model casino development without the user's need for information from architects, contractors or consultants. The target user would be a casino executive who had business experience, but minimal real estate development experience. Successful modeling would be based upon a favorable ratio of developmental costs to income projections known as Return on Investment (ROI). In this study factors used to calculate ROI for casino development projects were analyzed by examination of actual ROI calculations that were previously performed by experienced casino executives who had support from architect, contractors and consultants. The analysis started with the mathematical equations of ROI calculations and with identifying the key elements that led to the ROI projections. The factors were all carefully studied and detailed information was determined that was used to establish a system framework. The process to determine developmental costs and income projections was identified and illustrated through the creation of Data Flow Diagrams. Research determined that the system needed two distinct subsections. The first sub-system, a business system, would need to generate a complete set of financial statements. The second sub-system, a construction developmental system, would need to be capable of processing a complete detailed project budget. This information was used to create a basic simulation system for a framework to model casino development. The study provides a concept, plan and framework for future research and building of a fully functioning system."],"dc:format":["pdf"],"dc:identifier":["10.25669/py7b-yu0r","https://oasis.library.unlv.edu/rtds/1437","https://oasis.library.unlv.edu/context/rtds/article/2436/viewcontent/uc.pdf"],"dc:language":["English"],"dc:publisher":["University of Nevada, Las Vegas"],"dc:rights":["IN COPYRIGHT. For more information about this rights statement, please visit http://rightsstatements.org/vocab/InC/1.0/"],"dc:title":["Framework for a system to model casino development"],"dc:type":["Text"],"thesis:degree_discipline":["Civil and Environmental Engineering"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["Master of Engineering (ME)"]},"updated_at":"2026-07-24T05:25:26Z"}