{"id":{"repo_id":"uiuc","oai_identifier":"oai:www.ideals.illinois.edu:2142/83488"},"canonical_url":"https://search.dev.ndltd.org/etd/uiuc/oai:www.ideals.illinois.edu:2142/83488","repository":{"repo_id":"uiuc","name":"University of Illinois - Urbana-Champaign","base_url":"https://www.ideals.illinois.edu/oai-pmh"},"display":{"title":"Cost/benefit Analysis of Geographic Information System Implementation: Case of the Illinois Department of Transportation","abstract":"The Cost/Benefit analysis over the ten-year period produced an estimated Net Present Value of $2,981,000 and an Internal Rate of Return of 99.8% for GIS implementation. This knowledge of organizational costs and benefits enabled IDOT to strategically allocate organizational resources.","abstract_html":"The Cost/Benefit analysis over the ten-year period produced an estimated Net Present Value of $2,981,000 and an Internal Rate of Return of 99.8% for GIS implementation. This knowledge of organizational costs and benefits enabled IDOT to strategically allocate organizational resources.","abstract_has_math":false,"creators":["Hall, James Patrick"],"institution":"University of Illinois at Urbana-Champaign","degree_name":"Ph.D.","degree_level":"Dissertation","degree_discipline":"Civil and Environmental Engineering","degree_department":null,"school":null,"contributors":["Kim, Tschangho John"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-09-25T21:05:12Z","date_published":"2015-09-25T21:05:12Z","updated_at":"2026-07-22T22:26:21Z","subjects":["Computer Science"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["(MiAaPQ)AAI9953035"],"render_values":[{"text":"(MiAaPQ)AAI9953035","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/2142/83488","outbound_label":"Handle","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Kim, Tschangho John"]},{"key":"dc:creator","label":"Author","values":["Hall, James Patrick"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2015-09-25T21:05:12Z","10000-01-01","1999"]},{"key":"dc:type","label":"Dc Type","values":["text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil and Environmental Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ph.D."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Illinois at Urbana-Champaign"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Computer Science"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2142/83488","(MiAaPQ)AAI9953035"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The Cost/Benefit analysis over the ten-year period produced an estimated Net Present Value of $2,981,000 and an Internal Rate of Return of 99.8% for GIS implementation. This knowledge of organizational costs and benefits enabled IDOT to strategically allocate organizational resources.","Made available in DSpace on 2015-09-25T21:05:12Z (GMT). No. of bitstreams: 2 license.txt: 4848 bytes, checksum: 96035ab3f5e1c23cc7138a224ce498bd (MD5) 9953035.pdf: 14607242 bytes, checksum: e602c95d53edda700c6a1a46a06b2bd9 (MD5) Previous issue date: 1999","Embargo set by: Seth Robbins for item 84769 Lift date: Forever Reason: Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","U of I Only","319 p.","Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1999."]},{"key":"dc:title","label":"Title","values":["Cost/benefit Analysis of Geographic Information System Implementation: Case of the Illinois Department of Transportation"]}]}],"canonical_facts":{"dc:contributor":["Kim, Tschangho John"],"dc:creator":["Hall, James Patrick"],"dc:date":["2015-09-25T21:05:12Z","10000-01-01","1999"],"dc:description":["The Cost/Benefit analysis over the ten-year period produced an estimated Net Present Value of $2,981,000 and an Internal Rate of Return of 99.8% for GIS implementation. This knowledge of organizational costs and benefits enabled IDOT to strategically allocate organizational resources.","Made available in DSpace on 2015-09-25T21:05:12Z (GMT). No. of bitstreams: 2 license.txt: 4848 bytes, checksum: 96035ab3f5e1c23cc7138a224ce498bd (MD5) 9953035.pdf: 14607242 bytes, checksum: e602c95d53edda700c6a1a46a06b2bd9 (MD5) Previous issue date: 1999","Embargo set by: Seth Robbins for item 84769 Lift date: Forever Reason: Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","U of I Only","319 p.","Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1999."],"dc:identifier":["http://hdl.handle.net/2142/83488","(MiAaPQ)AAI9953035"],"dc:language":["eng"],"dc:subject":["Computer Science"],"dc:title":["Cost/benefit Analysis of Geographic Information System Implementation: Case of the Illinois Department of Transportation"],"dc:type":["text"],"thesis:degree_discipline":["Civil and Environmental Engineering"],"thesis:degree_level":["Dissertation"],"thesis:degree_name":["Ph.D."],"thesis:institution_name":["University of Illinois at Urbana-Champaign"]},"updated_at":"2026-07-22T22:26:21Z"}