{"id":{"repo_id":"uiuc","oai_identifier":"oai:www.ideals.illinois.edu:2142/83380"},"canonical_url":"https://search.dev.ndltd.org/etd/uiuc/oai:www.ideals.illinois.edu:2142/83380","repository":{"repo_id":"uiuc","name":"University of Illinois - Urbana-Champaign","base_url":"https://www.ideals.illinois.edu/oai-pmh"},"display":{"title":"A Hybrid Simulation Model for Understanding and Managing Non-Value Adding Activities in Large-Scale Design and Construction Projects","abstract":"The hybrid model developed in this research and the key findings gained through its application to real-world construction projects are envisioned to help construction managers to better understand and manage the dynamics of NVAAs, and ultimately minimize the risk of schedule delays and cost overruns in their large-scale construction projects.","abstract_html":"The hybrid model developed in this research and the key findings gained through its application to real-world construction projects are envisioned to help construction managers to better understand and manage the dynamics of NVAAs, and ultimately minimize the risk of schedule delays and cost overruns in their large-scale construction projects.","abstract_has_math":false,"creators":["Han, Sangwon"],"institution":"University of Illinois at Urbana-Champaign","degree_name":"Ph.D.","degree_level":"Dissertation","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":["Peña-Mora, Feniosky"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-09-25T21:04:35Z","date_published":"2015-09-25T21:04:35Z","updated_at":"2026-07-22T22:26:21Z","subjects":["Engineering, Civil"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["(MiAaPQ)AAI3337783"],"render_values":[{"text":"(MiAaPQ)AAI3337783","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/2142/83380","outbound_label":"Handle","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Peña-Mora, Feniosky"]},{"key":"dc:creator","label":"Author","values":["Han, Sangwon"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2015-09-25T21:04:35Z","10000-01-01","2008"]},{"key":"dc:type","label":"Dc Type","values":["text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ph.D."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Illinois at Urbana-Champaign"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering, Civil"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2142/83380","(MiAaPQ)AAI3337783"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The hybrid model developed in this research and the key findings gained through its application to real-world construction projects are envisioned to help construction managers to better understand and manage the dynamics of NVAAs, and ultimately minimize the risk of schedule delays and cost overruns in their large-scale construction projects.","Made available in DSpace on 2015-09-25T21:04:35Z (GMT). No. of bitstreams: 2 license.txt: 4848 bytes, checksum: 96035ab3f5e1c23cc7138a224ce498bd (MD5) 3337783.pdf: 2641054 bytes, checksum: a5227d8eb9497e0adec3e15a695474ca (MD5) Previous issue date: 2008","Embargo set by: Seth Robbins for item 84661 Lift date: Forever Reason: Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","U of I Only","143 p.","Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2008."]},{"key":"dc:title","label":"Title","values":["A Hybrid Simulation Model for Understanding and Managing Non-Value Adding Activities in Large-Scale Design and Construction Projects"]}]}],"canonical_facts":{"dc:contributor":["Peña-Mora, Feniosky"],"dc:creator":["Han, Sangwon"],"dc:date":["2015-09-25T21:04:35Z","10000-01-01","2008"],"dc:description":["The hybrid model developed in this research and the key findings gained through its application to real-world construction projects are envisioned to help construction managers to better understand and manage the dynamics of NVAAs, and ultimately minimize the risk of schedule delays and cost overruns in their large-scale construction projects.","Made available in DSpace on 2015-09-25T21:04:35Z (GMT). No. of bitstreams: 2 license.txt: 4848 bytes, checksum: 96035ab3f5e1c23cc7138a224ce498bd (MD5) 3337783.pdf: 2641054 bytes, checksum: a5227d8eb9497e0adec3e15a695474ca (MD5) Previous issue date: 2008","Embargo set by: Seth Robbins for item 84661 Lift date: Forever Reason: Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","U of I Only","143 p.","Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2008."],"dc:identifier":["http://hdl.handle.net/2142/83380","(MiAaPQ)AAI3337783"],"dc:language":["eng"],"dc:subject":["Engineering, Civil"],"dc:title":["A Hybrid Simulation Model for Understanding and Managing Non-Value Adding Activities in Large-Scale Design and Construction Projects"],"dc:type":["text"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Dissertation"],"thesis:degree_name":["Ph.D."],"thesis:institution_name":["University of Illinois at Urbana-Champaign"]},"updated_at":"2026-07-22T22:26:21Z"}