{"id":{"repo_id":"uiuc","oai_identifier":"oai:www.ideals.illinois.edu:2142/83291"},"canonical_url":"https://search.dev.ndltd.org/etd/uiuc/oai:www.ideals.illinois.edu:2142/83291","repository":{"repo_id":"uiuc","name":"University of Illinois - Urbana-Champaign","base_url":"https://www.ideals.illinois.edu/oai-pmh"},"display":{"title":"Comprehensive Simulation for End -Result Specification Development","abstract":"This work details the development of a simulation tool which can be used to analyze specification risk and to develop ERS systems with user-managed risk levels. Modeling and simulation of Illinois ERS highway project data clearly demonstrated that the magnitude and relative amounts of production and measurement variability play a key role in ERS risk. A novel procedure has been presented for estimating variabilities based on sound statistical principles. A Composite Risk Index (CRI) has been proposed to provide a single parameter for quantification of payment risk. An analysis of the old and new MOT pay factor equation for Superpave asphalt ERS was conducted, which highlighted the pros and cons of the new pay factor formula. Specific examples of how IDOT's existing ERS for Superpave HMA could be modified to reduce contractor and agency testing are also presented. An attempt has been made to define a strategy for developing a surrogate simulation model using a combination of tools like neural networks, decision trees and support vector machines.","abstract_html":"This work details the development of a simulation tool which can be used to analyze specification risk and to develop ERS systems with user-managed risk levels. Modeling and simulation of Illinois ERS highway project data clearly demonstrated that the magnitude and relative amounts of production and measurement variability play a key role in ERS risk. A novel procedure has been presented for estimating variabilities based on sound statistical principles. A Composite Risk Index (CRI) has been proposed to provide a single parameter for quantification of payment risk. An analysis of the old and new MOT pay factor equation for Superpave asphalt ERS was conducted, which highlighted the pros and cons of the new pay factor formula. Specific examples of how IDOT&#x27;s existing ERS for Superpave HMA could be modified to reduce contractor and agency testing are also presented. An attempt has been made to define a strategy for developing a surrogate simulation model using a combination of tools like neural networks, decision trees and support vector machines.","abstract_has_math":false,"creators":["Manik, Anshu"],"institution":"University of Illinois at Urbana-Champaign","degree_name":"Ph.D.","degree_level":"Dissertation","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":["Buttlar, William G."],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-09-25T21:04:07Z","date_published":"2015-09-25T21:04:07Z","updated_at":"2026-07-22T22:26:20Z","subjects":["Engineering, Civil"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["(MiAaPQ)AAI3223664"],"render_values":[{"text":"(MiAaPQ)AAI3223664","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/2142/83291","outbound_label":"Handle","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Buttlar, William G."]},{"key":"dc:creator","label":"Author","values":["Manik, Anshu"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2015-09-25T21:04:07Z","10000-01-01","2006"]},{"key":"dc:type","label":"Dc Type","values":["text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ph.D."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Illinois at Urbana-Champaign"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering, Civil"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2142/83291","(MiAaPQ)AAI3223664"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["This work details the development of a simulation tool which can be used to analyze specification risk and to develop ERS systems with user-managed risk levels. Modeling and simulation of Illinois ERS highway project data clearly demonstrated that the magnitude and relative amounts of production and measurement variability play a key role in ERS risk. A novel procedure has been presented for estimating variabilities based on sound statistical principles. A Composite Risk Index (CRI) has been proposed to provide a single parameter for quantification of payment risk. An analysis of the old and new MOT pay factor equation for Superpave asphalt ERS was conducted, which highlighted the pros and cons of the new pay factor formula. Specific examples of how IDOT's existing ERS for Superpave HMA could be modified to reduce contractor and agency testing are also presented. An attempt has been made to define a strategy for developing a surrogate simulation model using a combination of tools like neural networks, decision trees and support vector machines.","Made available in DSpace on 2015-09-25T21:04:07Z (GMT). No. of bitstreams: 2 license.txt: 4848 bytes, checksum: 96035ab3f5e1c23cc7138a224ce498bd (MD5) 3223664.pdf: 7242708 bytes, checksum: 9aabde1e64f7e5c6a54fa7bd878b7bc7 (MD5) Previous issue date: 2006","Embargo set by: Seth Robbins for item 84572 Lift date: Forever Reason: Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","U of I Only","307 p.","Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2006."]},{"key":"dc:title","label":"Title","values":["Comprehensive Simulation for End -Result Specification Development"]}]}],"canonical_facts":{"dc:contributor":["Buttlar, William G."],"dc:creator":["Manik, Anshu"],"dc:date":["2015-09-25T21:04:07Z","10000-01-01","2006"],"dc:description":["This work details the development of a simulation tool which can be used to analyze specification risk and to develop ERS systems with user-managed risk levels. Modeling and simulation of Illinois ERS highway project data clearly demonstrated that the magnitude and relative amounts of production and measurement variability play a key role in ERS risk. A novel procedure has been presented for estimating variabilities based on sound statistical principles. A Composite Risk Index (CRI) has been proposed to provide a single parameter for quantification of payment risk. An analysis of the old and new MOT pay factor equation for Superpave asphalt ERS was conducted, which highlighted the pros and cons of the new pay factor formula. Specific examples of how IDOT's existing ERS for Superpave HMA could be modified to reduce contractor and agency testing are also presented. An attempt has been made to define a strategy for developing a surrogate simulation model using a combination of tools like neural networks, decision trees and support vector machines.","Made available in DSpace on 2015-09-25T21:04:07Z (GMT). No. of bitstreams: 2 license.txt: 4848 bytes, checksum: 96035ab3f5e1c23cc7138a224ce498bd (MD5) 3223664.pdf: 7242708 bytes, checksum: 9aabde1e64f7e5c6a54fa7bd878b7bc7 (MD5) Previous issue date: 2006","Embargo set by: Seth Robbins for item 84572 Lift date: Forever Reason: Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","U of I Only","307 p.","Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2006."],"dc:identifier":["http://hdl.handle.net/2142/83291","(MiAaPQ)AAI3223664"],"dc:language":["eng"],"dc:subject":["Engineering, Civil"],"dc:title":["Comprehensive Simulation for End -Result Specification Development"],"dc:type":["text"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Dissertation"],"thesis:degree_name":["Ph.D."],"thesis:institution_name":["University of Illinois at Urbana-Champaign"]},"updated_at":"2026-07-22T22:26:20Z"}