{"id":{"repo_id":"uiuc","oai_identifier":"oai:www.ideals.illinois.edu:2142/69915"},"canonical_url":"https://search.dev.ndltd.org/etd/uiuc/oai:www.ideals.illinois.edu:2142/69915","repository":{"repo_id":"uiuc","name":"University of Illinois - Urbana-Champaign","base_url":"https://www.ideals.illinois.edu/oai-pmh"},"display":{"title":"Construction Project Selection Under Risk: Market Model Approach","abstract":"This study develops a construction project selection model under conditions of risk, and provides guidance for its implementation. The model consists of three parts. Part I selects an appropriate objective for the model based on shareholder's expected equity maximization, and examines some alternative objectives. Part II describes risk and return as two major variables of the objective. Risk is classified as economic, industry, company, and project characteristics. This classification allows the model to estimate the construction projects' required rates of return. Part III develops a criterion for decision making. The model allows the contractors to do sensitivity analysis of markup and risk to aid in project selection with and without resource constraints.","abstract_html":"This study develops a construction project selection model under conditions of risk, and provides guidance for its implementation. The model consists of three parts. Part I selects an appropriate objective for the model based on shareholder&#x27;s expected equity maximization, and examines some alternative objectives. Part II describes risk and return as two major variables of the objective. Risk is classified as economic, industry, company, and project characteristics. This classification allows the model to estimate the construction projects&#x27; required rates of return. Part III develops a criterion for decision making. The model allows the contractors to do sensitivity analysis of markup and risk to aid in project selection with and without resource constraints.","abstract_has_math":false,"creators":["Kangari, Roozbeh"],"institution":"University of Illinois at Urbana-Champaign","degree_name":"Ph.D.","degree_level":"Dissertation","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-12-15T20:35:56Z","date_published":"2014-12-15T20:35:56Z","updated_at":"2026-07-22T22:26:01Z","subjects":["Engineering, Civil"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["(UMI)AAI8302901"],"render_values":[{"text":"(UMI)AAI8302901","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/2142/69915","outbound_label":"Handle","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Kangari, Roozbeh"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2014-12-15T20:35:56Z","10000-01-01","1982"]},{"key":"dc:type","label":"Dc Type","values":["text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ph.D."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Illinois at Urbana-Champaign"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering, Civil"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2142/69915","(UMI)AAI8302901"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["This study develops a construction project selection model under conditions of risk, and provides guidance for its implementation. The model consists of three parts. Part I selects an appropriate objective for the model based on shareholder's expected equity maximization, and examines some alternative objectives. Part II describes risk and return as two major variables of the objective. Risk is classified as economic, industry, company, and project characteristics. This classification allows the model to estimate the construction projects' required rates of return. Part III develops a criterion for decision making. The model allows the contractors to do sensitivity analysis of markup and risk to aid in project selection with and without resource constraints.","Made available in DSpace on 2014-12-15T20:35:56Z (GMT). No. of bitstreams: 1 8302901.pdf: 3312551 bytes, checksum: a4e815b054f2f0d3b2282fa3be8cab8a (MD5) Previous issue date: 1982","Embargo set by: Seth Robbins for item 70081 Lift date: Forever Reason: Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","U of I Only","119 p.","Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1982."]},{"key":"dc:title","label":"Title","values":["Construction Project Selection Under Risk: Market Model Approach"]}]}],"canonical_facts":{"dc:creator":["Kangari, Roozbeh"],"dc:date":["2014-12-15T20:35:56Z","10000-01-01","1982"],"dc:description":["This study develops a construction project selection model under conditions of risk, and provides guidance for its implementation. The model consists of three parts. Part I selects an appropriate objective for the model based on shareholder's expected equity maximization, and examines some alternative objectives. Part II describes risk and return as two major variables of the objective. Risk is classified as economic, industry, company, and project characteristics. This classification allows the model to estimate the construction projects' required rates of return. Part III develops a criterion for decision making. The model allows the contractors to do sensitivity analysis of markup and risk to aid in project selection with and without resource constraints.","Made available in DSpace on 2014-12-15T20:35:56Z (GMT). No. of bitstreams: 1 8302901.pdf: 3312551 bytes, checksum: a4e815b054f2f0d3b2282fa3be8cab8a (MD5) Previous issue date: 1982","Embargo set by: Seth Robbins for item 70081 Lift date: Forever Reason: Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","Restricted to the U of I community idenfinitely during batch ingest of legacy ETDs","U of I Only","119 p.","Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 1982."],"dc:identifier":["http://hdl.handle.net/2142/69915","(UMI)AAI8302901"],"dc:subject":["Engineering, Civil"],"dc:title":["Construction Project Selection Under Risk: Market Model Approach"],"dc:type":["text"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Dissertation"],"thesis:degree_name":["Ph.D."],"thesis:institution_name":["University of Illinois at Urbana-Champaign"]},"updated_at":"2026-07-22T22:26:01Z"}