{"id":{"repo_id":"uiuc","oai_identifier":"oai:www.ideals.illinois.edu:2142/34219"},"canonical_url":"https://search.dev.ndltd.org/etd/uiuc/oai:www.ideals.illinois.edu:2142/34219","repository":{"repo_id":"uiuc","name":"University of Illinois - Urbana-Champaign","base_url":"https://www.ideals.illinois.edu/oai-pmh"},"display":{"title":"Incorporating asymmetric dependency patterns in the evaluation of IS/IT projects using real option analysis","abstract":"The objective of my dissertation is to create a general approach to evaluating IS/IT projects using Real Option Analysis (ROA). This is an important problem because an IT Project Portfolio (ITPP) can represent hundreds of projects, millions of dollars of investment and hundreds of thousands of employee hours. Therefore, any advance in the techniques used to manage an ITPP will save a significant amount of limited resources. A primary obstacle in using traditional methods to evaluate IS/IT projects is that they are notoriously risky. Cost overruns of 100%, or even outright failure are commonplace (Standish Group, 2009). When project volatility is high metrics such as NPV and ROI are of limited value. The weakness of these measures is that they are point estimates of static business environments and do not account for managerial flexibility. ROA has been a primary stream of MIS research for the last decade and is a suggested approach for evaluating projects in IS management frameworks such as COBIT and Val IT. There are several known issues that need to be addressed before project portfolios can be evaluated using ROA. Unlike investments in financial portfolios, projects in MIS are clearly not independent of each other. That is, companies invest in particular technologies that actively interact and often depend on each other, e.g. Java, Oracle, SAP etc. A second issue is that IS/IT projects and their driving variables can be non-normally distributed, non-linearly related, and asymmetrically correlated. These characteristics, especially inter and intra-project interactions between non-normally distributed variables, violate the assumptions of the basic Black-Scholes, Binomial, and Margrabe ROA models used in the current MIS research. This work suggests using a Monte Carlo approach to calculating option value using mathematical copulas. Copulas allow each variable that make up a multivariate distribution to be considered separately from the dependence structure between the variables. This work can be seen as a logical next step in the MIS literature, which has thus far focused on evaluating individual projects without interactions, and will enable practitioners to manage their ITPP as a whole, instead of as individual projects.","abstract_html":"The objective of my dissertation is to create a general approach to evaluating IS/IT projects using Real Option Analysis (ROA). This is an important problem because an IT Project Portfolio (ITPP) can represent hundreds of projects, millions of dollars of investment and hundreds of thousands of employee hours. Therefore, any advance in the techniques used to manage an ITPP will save a significant amount of limited resources. A primary obstacle in using traditional methods to evaluate IS/IT projects is that they are notoriously risky. Cost overruns of 100%, or even outright failure are commonplace (Standish Group, 2009). When project volatility is high metrics such as NPV and ROI are of limited value. The weakness of these measures is that they are point estimates of static business environments and do not account for managerial flexibility. ROA has been a primary stream of MIS research for the last decade and is a suggested approach for evaluating projects in IS management frameworks such as COBIT and Val IT. There are several known issues that need to be addressed before project portfolios can be evaluated using ROA. Unlike investments in financial portfolios, projects in MIS are clearly not independent of each other. That is, companies invest in particular technologies that actively interact and often depend on each other, e.g. Java, Oracle, SAP etc. A second issue is that IS/IT projects and their driving variables can be non-normally distributed, non-linearly related, and asymmetrically correlated. These characteristics, especially inter and intra-project interactions between non-normally distributed variables, violate the assumptions of the basic Black-Scholes, Binomial, and Margrabe ROA models used in the current MIS research. This work suggests using a Monte Carlo approach to calculating option value using mathematical copulas. Copulas allow each variable that make up a multivariate distribution to be considered separately from the dependence structure between the variables. This work can be seen as a logical next step in the MIS literature, which has thus far focused on evaluating individual projects without interactions, and will enable practitioners to manage their ITPP as a whole, instead of as individual projects.","abstract_has_math":false,"creators":["Burke, John"],"institution":"University of Illinois at Urbana-Champaign","degree_name":"Ph.D.","degree_level":"Dissertation","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":["Shaw, Michael J.","Chandler, John S.","Subramanyam, Ramanath","Tafti, Ali"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012-09-18T21:06:26Z","date_published":"2012-09-18T21:06:26Z","updated_at":"2026-07-22T22:25:30Z","subjects":["Real Options Analysis","Project Portfolio Management"],"languages":["en"],"rights":["Copyright 2012 John Burke"],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2142/34219","outbound_label":"Handle","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Shaw, Michael J.","Chandler, John S.","Subramanyam, Ramanath","Tafti, Ali"]},{"key":"dc:creator","label":"Author","values":["Burke, John"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2012-09-18T21:06:26Z","2012-08"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ph.D."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Illinois at Urbana-Champaign"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Real Options Analysis","Project Portfolio Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["Copyright 2012 John Burke"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2142/34219"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The objective of my dissertation is to create a general approach to evaluating IS/IT projects using Real Option Analysis (ROA). This is an important problem because an IT Project Portfolio (ITPP) can represent hundreds of projects, millions of dollars of investment and hundreds of thousands of employee hours. Therefore, any advance in the techniques used to manage an ITPP will save a significant amount of limited resources. A primary obstacle in using traditional methods to evaluate IS/IT projects is that they are notoriously risky. Cost overruns of 100%, or even outright failure are commonplace (Standish Group, 2009). When project volatility is high metrics such as NPV and ROI are of limited value. The weakness of these measures is that they are point estimates of static business environments and do not account for managerial flexibility. ROA has been a primary stream of MIS research for the last decade and is a suggested approach for evaluating projects in IS management frameworks such as COBIT and Val IT. There are several known issues that need to be addressed before project portfolios can be evaluated using ROA. Unlike investments in financial portfolios, projects in MIS are clearly not independent of each other. That is, companies invest in particular technologies that actively interact and often depend on each other, e.g. Java, Oracle, SAP etc. A second issue is that IS/IT projects and their driving variables can be non-normally distributed, non-linearly related, and asymmetrically correlated. These characteristics, especially inter and intra-project interactions between non-normally distributed variables, violate the assumptions of the basic Black-Scholes, Binomial, and Margrabe ROA models used in the current MIS research. This work suggests using a Monte Carlo approach to calculating option value using mathematical copulas. Copulas allow each variable that make up a multivariate distribution to be considered separately from the dependence structure between the variables. This work can be seen as a logical next step in the MIS literature, which has thus far focused on evaluating individual projects without interactions, and will enable practitioners to manage their ITPP as a whole, instead of as individual projects.","Item withdrawn by Mark Zulauf (zulauf@illinois.edu) on 2012-07-05T14:17:13Z Item was in collections: University of Illinois Theses & Dissertations (ID: 1) No. of bitstreams: 2 Burke_John.docx: 1068468 bytes, checksum: 779320d614e8fa8c54b5b848936efa6a (MD5) Burke_John.pdf: 2486478 bytes, checksum: af85b768bbd8213fdf445c39d7554894 (MD5)","Made available in DSpace on 2012-09-18T21:06:26Z (GMT). No. of bitstreams: 3 Burke_John.pdf: 2488485 bytes, checksum: f2b4e0f1aa59fb0c0e0dcdf288908cc5 (MD5) Burke_John.docx: 1058347 bytes, checksum: e5c8b5243ed683907ece2e6595a395a8 (MD5) license.txt: 4060 bytes, checksum: 91e6af68b2461116e63845a7ee4e68d6 (MD5)"]},{"key":"dc:title","label":"Title","values":["Incorporating asymmetric dependency patterns in the evaluation of IS/IT projects using real option analysis"]}]}],"canonical_facts":{"dc:contributor":["Shaw, Michael J.","Chandler, John S.","Subramanyam, Ramanath","Tafti, Ali"],"dc:creator":["Burke, John"],"dc:date":["2012-09-18T21:06:26Z","2012-08"],"dc:description":["The objective of my dissertation is to create a general approach to evaluating IS/IT projects using Real Option Analysis (ROA). This is an important problem because an IT Project Portfolio (ITPP) can represent hundreds of projects, millions of dollars of investment and hundreds of thousands of employee hours. Therefore, any advance in the techniques used to manage an ITPP will save a significant amount of limited resources. A primary obstacle in using traditional methods to evaluate IS/IT projects is that they are notoriously risky. Cost overruns of 100%, or even outright failure are commonplace (Standish Group, 2009). When project volatility is high metrics such as NPV and ROI are of limited value. The weakness of these measures is that they are point estimates of static business environments and do not account for managerial flexibility. ROA has been a primary stream of MIS research for the last decade and is a suggested approach for evaluating projects in IS management frameworks such as COBIT and Val IT. There are several known issues that need to be addressed before project portfolios can be evaluated using ROA. Unlike investments in financial portfolios, projects in MIS are clearly not independent of each other. That is, companies invest in particular technologies that actively interact and often depend on each other, e.g. Java, Oracle, SAP etc. A second issue is that IS/IT projects and their driving variables can be non-normally distributed, non-linearly related, and asymmetrically correlated. These characteristics, especially inter and intra-project interactions between non-normally distributed variables, violate the assumptions of the basic Black-Scholes, Binomial, and Margrabe ROA models used in the current MIS research. This work suggests using a Monte Carlo approach to calculating option value using mathematical copulas. Copulas allow each variable that make up a multivariate distribution to be considered separately from the dependence structure between the variables. This work can be seen as a logical next step in the MIS literature, which has thus far focused on evaluating individual projects without interactions, and will enable practitioners to manage their ITPP as a whole, instead of as individual projects.","Item withdrawn by Mark Zulauf (zulauf@illinois.edu) on 2012-07-05T14:17:13Z Item was in collections: University of Illinois Theses & Dissertations (ID: 1) No. of bitstreams: 2 Burke_John.docx: 1068468 bytes, checksum: 779320d614e8fa8c54b5b848936efa6a (MD5) Burke_John.pdf: 2486478 bytes, checksum: af85b768bbd8213fdf445c39d7554894 (MD5)","Made available in DSpace on 2012-09-18T21:06:26Z (GMT). No. of bitstreams: 3 Burke_John.pdf: 2488485 bytes, checksum: f2b4e0f1aa59fb0c0e0dcdf288908cc5 (MD5) Burke_John.docx: 1058347 bytes, checksum: e5c8b5243ed683907ece2e6595a395a8 (MD5) license.txt: 4060 bytes, checksum: 91e6af68b2461116e63845a7ee4e68d6 (MD5)"],"dc:identifier":["http://hdl.handle.net/2142/34219"],"dc:language":["en"],"dc:rights":["Copyright 2012 John Burke"],"dc:subject":["Real Options Analysis","Project Portfolio Management"],"dc:title":["Incorporating asymmetric dependency patterns in the evaluation of IS/IT projects using real option analysis"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Dissertation"],"thesis:degree_name":["Ph.D."],"thesis:institution_name":["University of Illinois at Urbana-Champaign"]},"updated_at":"2026-07-22T22:25:30Z"}