{"id":{"repo_id":"uiuc","oai_identifier":"oai:www.ideals.illinois.edu:2142/19566"},"canonical_url":"https://search.dev.ndltd.org/etd/uiuc/oai:www.ideals.illinois.edu:2142/19566","repository":{"repo_id":"uiuc","name":"University of Illinois - Urbana-Champaign","base_url":"https://www.ideals.illinois.edu/oai-pmh"},"display":{"title":"Factors for generating initial construction schedules","abstract":"Schedule generation is a vital construction planning tool which is founded on experiential knowledge and on engineering and management procedures. In this dissertation a Knowledge-based Systems (KBS) approach is followed for acquiring, formalizing and representing construction scheduling knowledge.","abstract_html":"Schedule generation is a vital construction planning tool which is founded on experiential knowledge and on engineering and management procedures. In this dissertation a Knowledge-based Systems (KBS) approach is followed for acquiring, formalizing and representing construction scheduling knowledge.","abstract_has_math":false,"creators":["Echeverry, Diego"],"institution":"University of Illinois at Urbana-Champaign","degree_name":"Ph.D.","degree_level":"Dissertation","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":["Ibbs, C. William"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2011,"date_issued":"2011-05-07T12:11:38Z","date_published":"2011-05-07T12:11:38Z","updated_at":"2026-07-22T22:25:14Z","subjects":["Business Administration, Management","Engineering, Civil","Artificial Intelligence"],"languages":["eng"],"rights":["Copyright 1991 Echeverry, Diego"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["AAI9136586","(UMI)AAI9136586"],"render_values":[{"text":"AAI9136586","href":null,"code":true},{"text":"(UMI)AAI9136586","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/2142/19566","outbound_label":"Handle","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Ibbs, C. William"]},{"key":"dc:creator","label":"Author","values":["Echeverry, Diego"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2011-05-07T12:11:38Z","10000-01-01","1991"]},{"key":"dc:type","label":"Dc Type","values":["text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Ph.D."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Illinois at Urbana-Champaign"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Business Administration, Management","Engineering, Civil","Artificial Intelligence"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["Copyright 1991 Echeverry, Diego"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["AAI9136586","(UMI)AAI9136586","http://hdl.handle.net/2142/19566"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Schedule generation is a vital construction planning tool which is founded on experiential knowledge and on engineering and management procedures. In this dissertation a Knowledge-based Systems (KBS) approach is followed for acquiring, formalizing and representing construction scheduling knowledge.","The knowledge acquisition process is based principally on the interviewing of experienced construction schedulers from five different construction firms. This process results in the formalization of key factors utilized by experienced schedulers for developing initial construction schedules.","A primary focus of this dissertation is the identification of the factors used to determine a logical sequencing of construction activities. Four major factors that govern activity sequencing are formalized in this dissertation: (1) physical relationships among building components, like supported-by, embedded-in, etc.; (2) interaction among crews, equipment, materials, etc.; (3) requirement of an interference-free path for components and their installation; and (4) code regulations to insure the safety of construction operations and the ability to supervise and inspect installed components.","This dissertation also includes the development of a KBS prototype named CASCH, Computer-assisted $\\underline{\\rm Sch\\/}$eduling, that incorporates a subset of the acquired knowledge. The function of the prototype is to serve as an aid to formalize and represent the acquired knowledge, and to demonstrate the feasibility of delivering scheduling knowledge in a way that enables user interaction. CASCH takes advantage of the object-oriented and rule-based knowledge representation tools offered by KEE$\\rm\\sp{\\sc TM}$, the Knowledge Engineering Environment distributed by Intellicorp. The prototype does not address the knowledge of precise detail about components, nor detailed task ordering. It focuses on the typical sequencing rules to aid in the generation of macro-level schedules.","This research work focuses on the scheduling of typical mid-rise commercial building construction. Typical mid-rise commercial building construction is defined here as the construction of building features that are common to most residential and office buildings.","Made available in DSpace on 2011-05-07T12:11:38Z (GMT). No. of bitstreams: 2 license.txt: 4922 bytes, checksum: 910b249b4beec47e7ab768910c8f966f (MD5) 9136586.pdf: 8073662 bytes, checksum: cd48cd94dd97c30aef0694371ffe1d99 (MD5) Previous issue date: 1991","Item marked as restricted to the 'UIUC Users [automated]' Group (id=2) by Howard Ding (hding2@illinois.edu) on 2011-05-07T14:37:55Z Item is restricted indefinitely.","Restriction data tranferred 2014-07-01T11:15:40-05:00 Original Data Group with Access UIUC Users [automated] Release Date: none Reason: ETDs are only available to UIUC Users without author permission","ETDs are only available to UIUC Users without author permission","U of I Only"]},{"key":"dc:title","label":"Title","values":["Factors for generating initial construction schedules"]}]}],"canonical_facts":{"dc:contributor":["Ibbs, C. William"],"dc:creator":["Echeverry, Diego"],"dc:date":["2011-05-07T12:11:38Z","10000-01-01","1991"],"dc:description":["Schedule generation is a vital construction planning tool which is founded on experiential knowledge and on engineering and management procedures. In this dissertation a Knowledge-based Systems (KBS) approach is followed for acquiring, formalizing and representing construction scheduling knowledge.","The knowledge acquisition process is based principally on the interviewing of experienced construction schedulers from five different construction firms. This process results in the formalization of key factors utilized by experienced schedulers for developing initial construction schedules.","A primary focus of this dissertation is the identification of the factors used to determine a logical sequencing of construction activities. Four major factors that govern activity sequencing are formalized in this dissertation: (1) physical relationships among building components, like supported-by, embedded-in, etc.; (2) interaction among crews, equipment, materials, etc.; (3) requirement of an interference-free path for components and their installation; and (4) code regulations to insure the safety of construction operations and the ability to supervise and inspect installed components.","This dissertation also includes the development of a KBS prototype named CASCH, Computer-assisted $\\underline{\\rm Sch\\/}$eduling, that incorporates a subset of the acquired knowledge. The function of the prototype is to serve as an aid to formalize and represent the acquired knowledge, and to demonstrate the feasibility of delivering scheduling knowledge in a way that enables user interaction. CASCH takes advantage of the object-oriented and rule-based knowledge representation tools offered by KEE$\\rm\\sp{\\sc TM}$, the Knowledge Engineering Environment distributed by Intellicorp. The prototype does not address the knowledge of precise detail about components, nor detailed task ordering. It focuses on the typical sequencing rules to aid in the generation of macro-level schedules.","This research work focuses on the scheduling of typical mid-rise commercial building construction. Typical mid-rise commercial building construction is defined here as the construction of building features that are common to most residential and office buildings.","Made available in DSpace on 2011-05-07T12:11:38Z (GMT). No. of bitstreams: 2 license.txt: 4922 bytes, checksum: 910b249b4beec47e7ab768910c8f966f (MD5) 9136586.pdf: 8073662 bytes, checksum: cd48cd94dd97c30aef0694371ffe1d99 (MD5) Previous issue date: 1991","Item marked as restricted to the 'UIUC Users [automated]' Group (id=2) by Howard Ding (hding2@illinois.edu) on 2011-05-07T14:37:55Z Item is restricted indefinitely.","Restriction data tranferred 2014-07-01T11:15:40-05:00 Original Data Group with Access UIUC Users [automated] Release Date: none Reason: ETDs are only available to UIUC Users without author permission","ETDs are only available to UIUC Users without author permission","U of I Only"],"dc:identifier":["AAI9136586","(UMI)AAI9136586","http://hdl.handle.net/2142/19566"],"dc:language":["eng"],"dc:rights":["Copyright 1991 Echeverry, Diego"],"dc:subject":["Business Administration, Management","Engineering, Civil","Artificial Intelligence"],"dc:title":["Factors for generating initial construction schedules"],"dc:type":["text"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Dissertation"],"thesis:degree_name":["Ph.D."],"thesis:institution_name":["University of Illinois at Urbana-Champaign"]},"updated_at":"2026-07-22T22:25:14Z"}