{"id":{"repo_id":"uiuc","oai_identifier":"oai:www.ideals.illinois.edu:2142/130992"},"canonical_url":"https://search.dev.ndltd.org/etd/uiuc/oai:www.ideals.illinois.edu:2142/130992","repository":{"repo_id":"uiuc","name":"University of Illinois - Urbana-Champaign","base_url":"https://www.ideals.illinois.edu/oai-pmh"},"display":{"title":"Surrogate Bounds For Makespan Minimization in Parallel Machine Scheduling Problems","abstract":"","abstract_html":null,"abstract_has_math":false,"creators":["Taaffe, Kevin Michael"],"institution":"University of Illinois Urbana-Champaign","degree_name":"M.S. (master's)","degree_level":"Thesis","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1990,"date_issued":"1990","date_published":"1990","updated_at":"2026-07-22T22:25:07Z","subjects":["Industrial Engineering"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Taaffe, Kevin Michael"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1990","2026-02-09T12:46:27-06:00"]},{"key":"dc:type","label":"Dc Type","values":["text"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. (master's)"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Illinois Urbana-Champaign"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Industrial Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:title","label":"Title","values":["Surrogate Bounds For Makespan Minimization in Parallel Machine Scheduling Problems"]}]}],"canonical_facts":{"dc:creator":["Taaffe, Kevin Michael"],"dc:date":["1990","2026-02-09T12:46:27-06:00"],"dc:language":["eng"],"dc:subject":["Industrial Engineering"],"dc:title":["Surrogate Bounds For Makespan Minimization in Parallel Machine Scheduling Problems"],"dc:type":["text"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["M.S. (master's)"],"thesis:institution_name":["University of Illinois Urbana-Champaign"]},"updated_at":"2026-07-22T22:25:07Z"}