Back to results

The University of Texas at Austin

Weekly crew scheduling for freight rail engineers : a network approach

Abstract

dc:description.abstract

Freight rail engineers and conductors have long faced unpredictable and inflexible work schedules, leading to on-the-job fatigue, compromised safety and poor work-life balance. This paper aims to design robust weekly schedules for these crew members to alleviate the pressures associated with irregular and unpredictable work hours. The scheduling problem is formulated as a multi-commodity network flow problem on a directed time-space graph. Both the two-city and three-city cases are addressed. To account for the variability in trip times, a range of scenarios is defined in which demand is increased by up to 20% to build slack into the schedules. The results are validated using Monte Carlo simulation where 100 random weekly instances are generated for each scenarios and key performance metrics assessed. Major findings show that (i) optimal weekly schedules can be constructed in minutes for engineers in crew districts with two cities, and in several hours for engineers in crew districts with three cities, (ii) different percentages of demand increase significantly affect the degree of robustness, and (iii) forming crew districts with three cities rather than two gives better results in terms of required number of engineer and trip coverage rates.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Operations Research and Industrial Engineering
Grantor
The University of Texas at Austin
Year dc:date.issued
2024

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Lyu, Jinhua
Advisor dc:contributor.advisor
  • Bard, Jonathan F.

Subjects

dc:subject × 5

Rights

Language dc:language.iso
English

Identifiers

dc:identifier.*
OAI identifier oai:identifier
oai:repositories.lib.utexas.edu:2152/131111

Chain of custody

source
Harvested from
University of Texas
Base URL
repositories.lib.utexas.edu/server/oai/request
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

Lyu, Jinhua. Weekly crew scheduling for freight rail engineers : a network approach. Masters thesis, The University of Texas at Austin, 2024. https://hdl.handle.net/2152/131111