Guideline for Implementing Accelerated Bridge Construction in South Dakota

Abstract

dc:description.abstract

<p>A study was conducted to investigate the implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time and interruption to traffic. Less interruption to traffic also lowers agency costs associated with traffic control and road user costs from delays and detours. The main objective of this study was to implement a systematic method for evaluating ABC techniques to determine their applicability to bridge construction and rehabilitation projects in South Dakota from a cost effectiveness standpoint. A comprehensive literature review was conducted in order to develop a catalog of ABC techniques, as well as detailed profiles describing the use of these techniques. These tools were used in conjunction with the ABC evaluation tool to help the decision-making process for any given construction project. Currently, SDDOT needs to determine whether ABC techniques will provide a more efficient use of construction funds than conventional bridge construction methods. Therefore, this research was geared toward developing both the knowledge base and the tool to evaluate if implementation of ABC techniques is beneficial to a particular project scenario based on South Dakota local cost and experience data. Many other state DOT offices currently have evaluation tools for ABC and some were used as references when designing the tool for SDDOT. Various types of program inputs, as well as output information were used in conjunction with decision-making flow charts to formulate the process that recommends whether or not to use ABC on a given bridge construction project. Examples for using the developed tool were also included in this study to illustrate the use of the evaluation tool for ABC decision making in South Dakota.</p>

Degree

thesis:*
Name thesis:degree_name
Master of Science (MS)
Level thesis:degree_level
Thesis - University Access Only
Discipline thesis:degree_discipline
Civil and Environmental Engineering
Year dc:date.available
2013

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • McMullen, Melissa Annora
Contributors dc:contributor
  • Nadim Wehbe

Subjects

dc:subject × 2

Rights

dc:rights
Statement dc:rights
  • <p>In Copyright - Non-Commercial Use Permitted<br /><a href="http://rightsstatements.org/vocab/InC-NC/1.0/">http://rightsstatements.org/vocab/InC-NC/1.0/</a></p>
Language dc:language
en

Identifiers

dc:identifier.*
Repository record dc:identifier
https://openprairie.sdstate.edu/etd/1586
OAI identifier oai:identifier
oai:openprairie.sdstate.edu:etd-2582

Chain of custody

source
Harvested from
South Dakota State University
Base URL
openprairie.sdstate.edu/do/oai/
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

McMullen, Melissa Annora. Guideline for Implementing Accelerated Bridge Construction in South Dakota. Thesis - University Access Only thesis, 2013. https://openprairie.sdstate.edu/etd/1586