South Dakota State University
Precast Full-Depth Deck Panels Supported on Inverted Bulb-Tee Bridge Girders
Abstract
dc:description.abstract<p>The South Dakota Department of Transportation (SDDOT) currently uses precast double-tee bridge deck systems for many of its county bridges because they are economical and fast in construction. Current bridges are designed for a service life of 75 years. However, many double-tee girder bridges are deteriorating and some need total replacement after 40 years in service. Furthermore, the double-tee bridge system only has one supplier in South Dakota. Alternative durable precast or prefabricated bridge systems are needed to provide more options to local governments when designing a new bridge. Different alternatives will also give local governments more flexibility to select the best system by comparing performance, availability, and cost of different options. The present study was carried out to investigate the feasibility of alternative prefabricated bridge systems that can be incorporated in South Dakota. The project technical panel approved testing of two superstructure bridge systems: (1) precast full-depth deck panels on prestressed inverted bulb-tee girders, and (2) glulam timber bridges. The present report includes the design, construction, and testing methods of the first bridge alternative. The proposed bridge system (precast full-depth deck panels on prestressed inverted bulb-tee girders) was designed based on a 50-ft long by 34.5-ft wide prototype bridge. The full-scale test bridge specimen was 50-ft long by 9.5-ft wide representing two interior girders from the prototype bridge. The bridge was first tested under 500,000 cycles of the AASHTO Fatigue II loading using a point-load applied at the mid-span. Next, the performance of transverse joints was evaluated by applying 150,000 AASHTO Fatigue II load cycles using two point loads applied adjacent to the middle panel transverse joints to maximize the shear transfer. Stiffness tests were performed at every 50,000 load cycle interval for both fatigue tests. No significant damage in addition to the shrinkage cracks was observed through the entire fatigue test, and the overall bridge stiffness did not show any signs of deterioration. Finally, the proposed bridge system was monotonically loaded to 263 kips to investigate the ultimate capacities. It was shown that the first crack loading magnitude was higher than the equivalent AASHTO Service and Strength I limit states, indicting sufficient performance. The design and construction of the proposed bridge system are simple and similar to current practice. Based on the construction, testing, and cost analysis, it can be concluded that the proposed bridge system, precast full-depth deck panels on prestressed inverted bulb-tee girders, is a viable alternative to the double-tee girder bridges.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science (MS)
- Level thesis:degree_level
- Thesis - Open Access
- Discipline thesis:degree_discipline
- Civil and Environmental Engineering
- Year dc:date.available
- 2016
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Mingo, Michael James
- Contributors dc:contributor
-
- Nadim I. Wehbe
- Mostafa Tazarv
Subjects
dc:subject × 9Rights
dc:rights- Language dc:language
- en
Identifiers
dc:identifier.*- Repository record dc:identifier
- https://openprairie.sdstate.edu/etd/1093
- OAI identifier oai:identifier
- oai:openprairie.sdstate.edu:etd-2093