Back to results

Technische Universität Dresden

IT Supported Construction Project Management Methodology Based on Process and Product Model and Quality Management

Abstract

dc:description.abstract

Computer Integrated Construction Project Management (CPM) supported by product and process models can be seen as a future type of integration structure facilitating the solution of various management problems in the fragmented Construction Industry. The key to success is directly correlated with the comprehensive integration of currently isolated IT applications. However, despite that a number of initiatives have been developed, no fully generic models have yet to be formally standardized. This topic has been the subject of intensive research during the last decades. In this thesis a Computer Integrated CPM approach, which is supported by IFC (Industry Foundation Classes) and ISO9001:2000 Quality Management System, is proposed. The main aim is to provide integration of product, process and organizational information to help achieve the interoperability of the involved actors and tools in a concurrent environment. According to implied requirements which are represented in the ‘state of the art’ section, the fundamental concepts are presented in two parts as: (1) realization of CPM in an IT concept and (2) formalization of IFC Views for software interoperability on the example of Bidding Preparation Phase. In order to realize a generic framework using a high-level process core model named Organizational Management Process (OMP) model, different aspects have been brought together into a consistent life cycle structure. These are: (1) a set of layered processes based on ISO procedural definitions, (2) software integration requirements based on Construction Management Phases, (3) application methods of the Procurement System and (4) Organizational data. This provides for synchronizing technical products, processes, documents, and actors in their inter-relationship. The framework is hierarchically structured in three layers Phases – Processes - Product data. The developed IT Management Processes (ITMP) which are used as a baseline for the IFC Views implementation are derived from the OMP. Moreover, in order to support completeness, a mapping structure between processes and scenarios based on the Procurement Systems was constituted. The representation of OMP and ITMP is provided by using the ARIS eEPC (extended event-driven process chain) modeling method. On the basis of a generalized representation of product data, a system-wide integration model for heterogeneous client applications which supports different CPM areas can be achieved. IFC Product Data Model integrates different domains thereby enabling coordination of bidding preparations. However, there is a need to realize individual model subsets. i.e. views of the product model. In this context, adaptable views were developed based on ITMP. The defined resources’ relevancies to IFC Objects are examined by realizing central information elements. These provide a mapping structure between process resources and IFC Classes. On that basis integration of process and product models can be accomplished. In order to realize IFC Views, IFC Concepts and IFC Instance Diagrams were developed based on IFC View Definition Format. The grouping of IFC Concepts enables the implementation of the adaptable IFC Views that are required for standardized system integration. This is achieved with the help of formal specification using the Generalized Subset Definition Schema. The validation has been made based on an alphanumerical comparison. The selected 3D full-model and the developed IFC View for Product Catalog models are compared in this context. There are two consequences observed. In the first case, which also addresses Unit Price Procurement systems, the desired results were obtained by filtering the required data. However, when the results were compared for Design & Build and Lump-sum Procurement Systems (contracts), an extension need was observed in the IFC Model. The solution is provided via formalization of cost data and material analysis information by an extension of IFC Concept namely ‘IfcConstructionResource’ with new classes and with new relations. Thereby a common information model based on the data schema of the IFC standard is constituted.

Degree

thesis:*
Level thesis:degree_level
thesis.doctoral
Grantor dc:publisher
Technische Universität Dresden
Year
2008

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Goekce, Kamil Umut
Contributors dc:contributor
  • Scherer, Raimar J.
  • Dikbas, H. Attila
  • Froese, Thomas

Subjects

dc:subject × 6

Chain of custody

source
Harvested from
QUCOSA
Base URL
www.qucosa.de/oai/
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

Goekce, Kamil Umut. IT Supported Construction Project Management Methodology Based on Process and Product Model and Quality Management. thesis.doctoral thesis, Technische Universität Dresden, 2008.