Repetitive project scheduling using genetic algorithms

Abstract

dc:description.abstract

Repetitive projects consist of multiple units that are identical or similar in nature, with various activities or trades repeatedly executed from one physical unit to another during the construction process. This repetitive construction process renders it desirable to schedule the execution of these trades as uninterrupted and continuous work sequences by imposing a work continuity constraint whenever necessary. This study proposes a scheduling approach for repetitive projects by using a set of recurrence equations which can ensure work continuity through imposing a scheduling constraint that adjusts the calculations of activity start/finish times. This set of equations also forms the basis for optimizing the schedules of repetitive projects with an evolutionary optimization technique. The Genetic Algorithm is used to search for the best schedule by varying the crew size and work continuity requirements of the project activities. The schedules which have lower work continuity and do not meet deadlines are penalized.

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • TAN HENG WEE

Subjects

dc:subject × 1

Chain of custody

source
Harvested from
National University of Singapore
Base URL
scholarbank.nus.edu.sg/oai/request
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

TAN HENG WEE. Repetitive project scheduling using genetic algorithms. 2005.