Back to results

Monterey, CA; Naval Postgraduate School

Enhancing persistence when optimally scheduling depot-level repair activity for the United States Marine Corps

Abstract

dc:description.abstract

The United States Marine Corps' ability to wage war and its warfighting effectiveness rely heavily on the availability of its tactical ground equipment. The Marine Corps optimizes the warfighting availability of its tactical ground equipment in its depot-level repair plan, which commits $450 million over a six-year horizon. Currently, small changes (for example, budget) to the input to this model produce non-intuitive revisions that are needlessly disruptive. The Marine Corps Materiel Command (MATCOM) recognizes this problem and has asked for enhancement of their current model to include persistent features. We show that turbulence can be reduced at little cost in warfighting availability. We also investigate an approximate, but very fast heuristic in lieu of mathematical optimization to solve this problem. A simple greedy myopic heuristic quickly produces nearly-optimal advice to the depot-level planning problem.

Degree

thesis:*
Department dc:contributor.department
Operations Research (OR)
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2003

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Drexler, Jonathan A.
Advisor dc:contributor.advisor
  • Brown, Gerald G.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/999
OAI identifier oai:identifier
oai:calhoun.nps.edu:10945/999

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-07-27
Source record
OAI-PMH GetRecord
related terms
citation

Drexler, Jonathan A.. Enhancing persistence when optimally scheduling depot-level repair activity for the United States Marine Corps. Monterey, CA; Naval Postgraduate School, 2003. https://hdl.handle.net/10945/999