{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9676"},"canonical_url":"https://search.dev.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9676","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A case analysis of energy savings performance contract projects and photovoltaic energy at Fort Bliss, El Paso, Texas","abstract":"The purpose of this MBA Project is to review existing policy of the Federal Energy Management Program under the purview of National Renewal Energy Laboratory (NREL) for Energy Savings Performance Contracts (ESPCs). This project will assess the ability for the Department of Defense to incorporate emerging technologies in alternative energy to supplement or replace existing power sources for DoD installations within the current Energy Savings Performance Contract policy. To do this the project will review previous and existing Energy Savings Performance Contracts. Further, this project will conduct a cost-benefit analysis of conventional power versus emerging photovoltaic energy for the Army’s Fort Bliss in El Paso, TX. The project will also analyze energy demands based on a new force alignment at Fort Bliss in accordance with the recent Base Realignment and Closure (BRAC) findings. The project will review current Energy Performance Contract Policy and recommend changes to allow for the use of emerging alternative energy technologies.","abstract_html":"The purpose of this MBA Project is to review existing policy of the Federal Energy Management Program under the purview of National Renewal Energy Laboratory (NREL) for Energy Savings Performance Contracts (ESPCs). This project will assess the ability for the Department of Defense to incorporate emerging technologies in alternative energy to supplement or replace existing power sources for DoD installations within the current Energy Savings Performance Contract policy. To do this the project will review previous and existing Energy Savings Performance Contracts. Further, this project will conduct a cost-benefit analysis of conventional power versus emerging photovoltaic energy for the Army’s Fort Bliss in El Paso, TX. The project will also analyze energy demands based on a new force alignment at Fort Bliss in accordance with the recent Base Realignment and Closure (BRAC) findings. The project will review current Energy Performance Contract Policy and recommend changes to allow for the use of emerging alternative energy technologies.","abstract_has_math":false,"creators":["Barich, William J.","Dessing, Brent L.","Harley, Antonio B."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Tudor, Ron","Cuskey, Jeffrey"],"committee_chairs":[],"committee_members":[],"year":2006,"date_issued":"2006-06","date_published":"2006-06","updated_at":"2026-07-27T20:25:20Z","subjects":[],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9676","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Tudor, Ron","Cuskey, Jeffrey"]},{"key":"dc:creator","label":"Author","values":["Barich, William J.","Dessing, Brent L.","Harley, Antonio B."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T22:58:51Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T22:58:51Z"]},{"key":"dc:date.issued","label":"Date","values":["2006-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/9676"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this MBA Project is to review existing policy of the Federal Energy Management Program under the purview of National Renewal Energy Laboratory (NREL) for Energy Savings Performance Contracts (ESPCs). This project will assess the ability for the Department of Defense to incorporate emerging technologies in alternative energy to supplement or replace existing power sources for DoD installations within the current Energy Savings Performance Contract policy. To do this the project will review previous and existing Energy Savings Performance Contracts. Further, this project will conduct a cost-benefit analysis of conventional power versus emerging photovoltaic energy for the Army’s Fort Bliss in El Paso, TX. The project will also analyze energy demands based on a new force alignment at Fort Bliss in accordance with the recent Base Realignment and Closure (BRAC) findings. The project will review current Energy Performance Contract Policy and recommend changes to allow for the use of emerging alternative energy technologies."]},{"key":"dc:title","label":"Title","values":["A case analysis of energy savings performance contract projects and photovoltaic energy at Fort Bliss, El Paso, Texas"]}]}],"canonical_facts":{"dc:contributor.advisor":["Tudor, Ron","Cuskey, Jeffrey"],"dc:creator":["Barich, William J.","Dessing, Brent L.","Harley, Antonio B."],"dc:date.accessioned":["2012-08-09T22:58:51Z"],"dc:date.available":["2012-08-09T22:58:51Z"],"dc:date.issued":["2006-06"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this MBA Project is to review existing policy of the Federal Energy Management Program under the purview of National Renewal Energy Laboratory (NREL) for Energy Savings Performance Contracts (ESPCs). This project will assess the ability for the Department of Defense to incorporate emerging technologies in alternative energy to supplement or replace existing power sources for DoD installations within the current Energy Savings Performance Contract policy. To do this the project will review previous and existing Energy Savings Performance Contracts. Further, this project will conduct a cost-benefit analysis of conventional power versus emerging photovoltaic energy for the Army’s Fort Bliss in El Paso, TX. The project will also analyze energy demands based on a new force alignment at Fort Bliss in accordance with the recent Base Realignment and Closure (BRAC) findings. The project will review current Energy Performance Contract Policy and recommend changes to allow for the use of emerging alternative energy technologies."],"dc:identifier.uri":["https://hdl.handle.net/10945/9676"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:title":["A case analysis of energy savings performance contract projects and photovoltaic energy at Fort Bliss, El Paso, Texas"],"dc:type":["Thesis"]},"updated_at":"2026-07-27T20:25:20Z"}