Back to results

Naval Postgraduate School

Performance bonds under the Federal Acquisition Streamling Act (1994)

Abstract

dc:description.abstract

With the passage of the Federal Acquisition Streamlining Act (FASA) of 1994, the U.S. Federal Government set in motion a process which is intended to reform the federal acquisition process with the aim of achieving greater efficiency and value. Although numerous initiatives have been adopted in pursuit of this goal, one area which has been neglected is performance bonds. In keeping with the Total Quality Management (TQM) objective of reaping benefits from the 'low hanging fruit' first, this paper examines the potential savings available as a result of relatively minor changes to the way requirements for performance bonds on Navy construction contracts are determined. The result is savings which appear to be 'hanging low' indeed. By shifting to a risk-based system of requiring performance bonds only on those contract with an appreciable default risk, savings of 0.5% to 1.0% of the gross cost of construction appear to be available with very little loss potential

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Tave, Gary A

Rights

Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/8815
OAI identifier oai:identifier
oai:calhoun.nps.edu:10945/8815

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-07-27
Source record
OAI-PMH GetRecord
related terms
citation

Tave, Gary A. Performance bonds under the Federal Acquisition Streamling Act (1994). 1997. https://hdl.handle.net/10945/8815