{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/26157"},"canonical_url":"https://search.dev.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/26157","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Performance measurement in the RAMP SMP facility.","abstract":"The Rapid Acquisition of Manufactured Parts (RAMP) program is a Navy initiative to address the problems of high cost, growing leadtime and diminishing sources for spare parts. RAMP addresses this by developing digital parts technical data and computer integrated manufacturing (CIM) capability within the Navy and integrating this capability into the Navy's supply and weapons acquisition systems. Management will require timely, accurate cost and operational data to evaluate the efficiency of the RAMP facility and its effectiveness in achieving program goals. Traditional accounting and performance measurement systems produce inadequate data in a CIM environment. This thesis derives objectives for the facility from program goals and proposes measurements to assess the achievement of these. The measurements emphasize flexibility, quality, efficiency and support of RAMP program goals.","abstract_html":"The Rapid Acquisition of Manufactured Parts (RAMP) program is a Navy initiative to address the problems of high cost, growing leadtime and diminishing sources for spare parts. RAMP addresses this by developing digital parts technical data and computer integrated manufacturing (CIM) capability within the Navy and integrating this capability into the Navy&#x27;s supply and weapons acquisition systems. Management will require timely, accurate cost and operational data to evaluate the efficiency of the RAMP facility and its effectiveness in achieving program goals. Traditional accounting and performance measurement systems produce inadequate data in a CIM environment. This thesis derives objectives for the facility from program goals and proposes measurements to assess the achievement of these. The measurements emphasize flexibility, quality, efficiency and support of RAMP program goals.","abstract_has_math":false,"creators":["Martin, Michael Paul"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Euske, Kenneth J.","Matthews, Danny G."],"committee_chairs":[],"committee_members":[],"year":1989,"date_issued":"1989-06","date_published":"1989-06","updated_at":"2026-07-27T20:25:53Z","subjects":[],"languages":["en_US"],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/26157","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Euske, Kenneth J.","Matthews, Danny G."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Martin, Michael Paul"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1989"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T21:56:27Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T21:56:27Z"]},{"key":"dc:date.issued","label":"Date","values":["1989-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/26157"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Rapid Acquisition of Manufactured Parts (RAMP) program is a Navy initiative to address the problems of high cost, growing leadtime and diminishing sources for spare parts. RAMP addresses this by developing digital parts technical data and computer integrated manufacturing (CIM) capability within the Navy and integrating this capability into the Navy's supply and weapons acquisition systems. Management will require timely, accurate cost and operational data to evaluate the efficiency of the RAMP facility and its effectiveness in achieving program goals. Traditional accounting and performance measurement systems produce inadequate data in a CIM environment. This thesis derives objectives for the facility from program goals and proposes measurements to assess the achievement of these. The measurements emphasize flexibility, quality, efficiency and support of RAMP program goals."]},{"key":"dc:title","label":"Title","values":["Performance measurement in the RAMP SMP facility."]}]}],"canonical_facts":{"dc:contributor.advisor":["Euske, Kenneth J.","Matthews, Danny G."],"dc:contributor.department":["Administrative Sciences"],"dc:creator":["Martin, Michael Paul"],"dc:date":["June 1989"],"dc:date.accessioned":["2013-01-23T21:56:27Z"],"dc:date.available":["2013-01-23T21:56:27Z"],"dc:date.issued":["1989-06"],"dc:description.abstract":["The Rapid Acquisition of Manufactured Parts (RAMP) program is a Navy initiative to address the problems of high cost, growing leadtime and diminishing sources for spare parts. RAMP addresses this by developing digital parts technical data and computer integrated manufacturing (CIM) capability within the Navy and integrating this capability into the Navy's supply and weapons acquisition systems. Management will require timely, accurate cost and operational data to evaluate the efficiency of the RAMP facility and its effectiveness in achieving program goals. Traditional accounting and performance measurement systems produce inadequate data in a CIM environment. This thesis derives objectives for the facility from program goals and proposes measurements to assess the achievement of these. The measurements emphasize flexibility, quality, efficiency and support of RAMP program goals."],"dc:identifier.uri":["https://hdl.handle.net/10945/26157"],"dc:language.iso":["en_US"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Performance measurement in the RAMP SMP facility."],"dc:type":["Thesis"]},"updated_at":"2026-07-27T20:25:53Z"}