{"id":{"repo_id":"nott-trent","oai_identifier":"oai:irep.ntu.ac.uk:29"},"canonical_url":"https://search.dev.ndltd.org/etd/nott-trent/oai:irep.ntu.ac.uk:29","repository":{"repo_id":"nott-trent","name":"Nottingham Trent University","base_url":"https://irep.ntu.ac.uk/cgi/oai2"},"display":{"title":"The development of an innovative sustainable Total Planning and Control system for construction projects","abstract":"The management of construction projects has been heavily criticised by government institutions, academics and practitioners for delays, cost overruns and suboptimum performance. Numerous studies have identified project planning as the main problem with both the management methodology and conventional project planning techniques deemed insufficient. It has been established that only fifty per cent of the planned work is completed as scheduled. This is consistent with the findings of this study, which again confirms the insufficiency of the techniques available to the general practitioner. This research explores operational problems associated with project planning and control, and develops an innovative and holistic planning and control system to deliver sustainable construction projects. A qualitative strategy was adopted for this study utilising interviews and multiple case study methods, which are complementary approaches. In total, four case studies were selected from the predominant UK construction industry and 81 interviews were conducted for this study. Given the criticisms of qualitative research as methodologically weak, this study develops a research process that addresses the specific objectives of the study.","abstract_html":"The management of construction projects has been heavily criticised by government institutions, academics and practitioners for delays, cost overruns and suboptimum performance. Numerous studies have identified project planning as the main problem with both the management methodology and conventional project planning techniques deemed insufficient. It has been established that only fifty per cent of the planned work is completed as scheduled. This is consistent with the findings of this study, which again confirms the insufficiency of the techniques available to the general practitioner. This research explores operational problems associated with project planning and control, and develops an innovative and holistic planning and control system to deliver sustainable construction projects. A qualitative strategy was adopted for this study utilising interviews and multiple case study methods, which are complementary approaches. In total, four case studies were selected from the predominant UK construction industry and 81 interviews were conducted for this study. Given the criticisms of qualitative research as methodologically weak, this study develops a research process that addresses the specific objectives of the study.","abstract_has_math":false,"creators":["Agyekum-Mensah, G"],"institution":"Nottingham Trent University","degree_name":"phd","degree_level":"doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013","date_published":"2013","updated_at":"2026-07-24T06:30:42Z","subjects":[],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Agyekum-Mensah, G"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2013"]},{"key":"dc:date.issued","label":"Date","values":["2013"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["Nottingham Trent University"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["https://irep.ntu.ac.uk/id/eprint/29/"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["doctoral"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["phd"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://irep.ntu.ac.uk/id/eprint/29/1/217167_George%2520Mensah%25202013%2520-%2520Thesis.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The management of construction projects has been heavily criticised by government institutions, academics and practitioners for delays, cost overruns and suboptimum performance. Numerous studies have identified project planning as the main problem with both the management methodology and conventional project planning techniques deemed insufficient. It has been established that only fifty per cent of the planned work is completed as scheduled. This is consistent with the findings of this study, which again confirms the insufficiency of the techniques available to the general practitioner. This research explores operational problems associated with project planning and control, and develops an innovative and holistic planning and control system to deliver sustainable construction projects. A qualitative strategy was adopted for this study utilising interviews and multiple case study methods, which are complementary approaches. In total, four case studies were selected from the predominant UK construction industry and 81 interviews were conducted for this study. Given the criticisms of qualitative research as methodologically weak, this study develops a research process that addresses the specific objectives of the study."]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dc:title","label":"Title","values":["The development of an innovative sustainable Total Planning and Control system for construction projects"]}]}],"canonical_facts":{"dc:creator":["Agyekum-Mensah, G"],"dc:date":["2013"],"dc:date.issued":["2013"],"dc:description.abstract":["The management of construction projects has been heavily criticised by government institutions, academics and practitioners for delays, cost overruns and suboptimum performance. Numerous studies have identified project planning as the main problem with both the management methodology and conventional project planning techniques deemed insufficient. It has been established that only fifty per cent of the planned work is completed as scheduled. This is consistent with the findings of this study, which again confirms the insufficiency of the techniques available to the general practitioner. This research explores operational problems associated with project planning and control, and develops an innovative and holistic planning and control system to deliver sustainable construction projects. A qualitative strategy was adopted for this study utilising interviews and multiple case study methods, which are complementary approaches. In total, four case studies were selected from the predominant UK construction industry and 81 interviews were conducted for this study. Given the criticisms of qualitative research as methodologically weak, this study develops a research process that addresses the specific objectives of the study."],"dc:format":["text"],"dc:identifier.uri":["https://irep.ntu.ac.uk/id/eprint/29/1/217167_George%2520Mensah%25202013%2520-%2520Thesis.pdf"],"dc:language":["en"],"dc:publisher.institution":["Nottingham Trent University"],"dc:relation.isreferencedby":["https://irep.ntu.ac.uk/id/eprint/29/"],"dc:title":["The development of an innovative sustainable Total Planning and Control system for construction projects"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["doctoral"],"dc:type.qualificationname":["phd"]},"updated_at":"2026-07-24T06:30:42Z"}