Back to results

NJIT

Case studies in disassembly process planning

Abstract

dc:description.abstract

The rapid advancement in technology started in last century and still continuing resulted in decreased life cycle of electronic products. It also resulted in increased product disposal rate and filling land fill space faster causing shortage of such space and consequently creates major environmental problems. So, since couple of decade environmental concern has focused on production process and environmental regulations imposed by government has watched industrial pollution. With government regulations to control environmental problems; consumers are also aware of adverse effects of product disposal forcing manufacturer to become more responsible for safe product disposal and recycling of used product. A necessary condition to disassemble any product more efficiently is the availability of a disassembly process plan. In this thesis we represent set of intelligent disassembly rules that are able to automatically generate a disassembly plan. Few electronic equipments have been used to carry out experiments of disassembly process plans generation. So, based on established disassembly rules disassembly process plans have been generated having several steps in each plan. Each step describes action to be taken on particular part of assembly, disassembly time and effort we need to put to carry out that operation. Final economic analysis is carried out to show economic gain achieved though disassembly process.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Industrial Engineering - (M.S.)
Discipline thesis:degree_discipline
Industrial and Manufacturing Engineering
Year
2004

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Dhimmar, Riteshkumar
Contributors dc:contributor
  • Sanchoy K. Das
  • R. S. Sodhi
  • George Hanna Abdou

Subjects

dc:subject × 3

Identifiers

dc:identifier.*
Repository record dc:identifier
https://digitalcommons.njit.edu/theses/547
OAI identifier oai:identifier
oai:digitalcommons.njit.edu:theses-1546

Chain of custody

source
Harvested from
NJIT
Base URL
digitalcommons.njit.edu/do/oai/
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

Dhimmar, Riteshkumar. Case studies in disassembly process planning. 2004. https://digitalcommons.njit.edu/theses/547