{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/9710"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/9710","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"System dynamic models for construction projects","abstract":"This thesis studies the application of system dynamics principles and models to construction project negotiations and schedule. It helps improve the efficiency of the negotiation processes and allows planners to realize the shortcomings of their proposed schedules through showing the relationships and interactions between variables in the processes or the schedules. This research is conducted as an effort to demonstrate the usefulness of the system dynamics models on the construction industry. By developing robust system dynamics models, the efficiencies and the overall performances of the construction projects could be improved as the probability of project delay would be significantly reduced through, much better planning and more efficient negotiation process.","abstract_html":"This thesis studies the application of system dynamics principles and models to construction project negotiations and schedule. It helps improve the efficiency of the negotiation processes and allows planners to realize the shortcomings of their proposed schedules through showing the relationships and interactions between variables in the processes or the schedules. This research is conducted as an effort to demonstrate the usefulness of the system dynamics models on the construction industry. By developing robust system dynamics models, the efficiencies and the overall performances of the construction projects could be improved as the probability of project delay would be significantly reduced through, much better planning and more efficient negotiation process.","abstract_has_math":false,"creators":["Kwok, Sze Yiu Gordon, 1974-"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering","school":null,"contributors":[],"advisors":["Feniosky Peña-Mora."],"committee_chairs":[],"committee_members":[],"year":1999,"date_issued":"1999","date_published":"1999","updated_at":"2026-07-22T22:20:44Z","subjects":["Civil and Environmental Engineering"],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/9710","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Feniosky Peña-Mora."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering"]},{"key":"dc:creator","label":"Author","values":["Kwok, Sze Yiu Gordon, 1974-"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2005-08-19T19:38:11Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2005-08-19T19:38:11Z"]},{"key":"dc:date.issued","label":"Date","values":["1999"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Civil and Environmental Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/9710"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1999.","Includes bibliographical references (leaves 111-113)."]},{"key":"dc:description.abstract","label":"Abstract","values":["This thesis studies the application of system dynamics principles and models to construction project negotiations and schedule. It helps improve the efficiency of the negotiation processes and allows planners to realize the shortcomings of their proposed schedules through showing the relationships and interactions between variables in the processes or the schedules. This research is conducted as an effort to demonstrate the usefulness of the system dynamics models on the construction industry. By developing robust system dynamics models, the efficiencies and the overall performances of the construction projects could be improved as the probability of project delay would be significantly reduced through, much better planning and more efficient negotiation process."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["System dynamic models for construction projects"]}]}],"canonical_facts":{"dc:contributor.advisor":["Feniosky Peña-Mora."],"dc:contributor.department":["Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering"],"dc:creator":["Kwok, Sze Yiu Gordon, 1974-"],"dc:date.accessioned":["2005-08-19T19:38:11Z"],"dc:date.available":["2005-08-19T19:38:11Z"],"dc:date.issued":["1999"],"dc:description":["Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1999.","Includes bibliographical references (leaves 111-113)."],"dc:description.abstract":["This thesis studies the application of system dynamics principles and models to construction project negotiations and schedule. It helps improve the efficiency of the negotiation processes and allows planners to realize the shortcomings of their proposed schedules through showing the relationships and interactions between variables in the processes or the schedules. This research is conducted as an effort to demonstrate the usefulness of the system dynamics models on the construction industry. By developing robust system dynamics models, the efficiencies and the overall performances of the construction projects could be improved as the probability of project delay would be significantly reduced through, much better planning and more efficient negotiation process."],"dc:description.degree":["S.M."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/9710"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Civil and Environmental Engineering"],"dc:title":["System dynamic models for construction projects"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:20:44Z"}