Back to results

Massachusetts Institute of Technology

Priority queuing for raw material receiving

Abstract

dc:description.abstract

The Amgen Manufacturing Ltd. facility in Juncos, Puerto Rico faces a challenge encountered by manufacturers across industries: How can they make the best use of their existing resources? As production volume and product mix increase, how are costs kept from increasing as well? This LGO internship looked to answer those questions in the context of raw material receiving for biopharmaceutical manufacturing. Over the course of the seven month project, an analytical planning tool centered on scheduling optimization and priority queuing was developed, highlighting areas for improvement. Based on insight gained from the tool, a plan was established which can reduce turnaround time (TAT) by 50% and work in process (WIP) by 45% in the raw material sampling area. The improvements will not only provide financial and operational benefits to the organization, but serve as a foundation for continuous improvement as the findings from this project are applied elsewhere. This project highlights the importance of understanding how process inputs affect process output. In the case of raw material sampling, the variable mix of incoming materials exceeded the capacity for processing, particularly for solid materials, elevating the average TAT and WIP. Aligning sampling's capabilities to the input work makes it more flexible and better able to handle future demand. However, the ideal state for the area involves working with the upstream group, supply chain, to level-load arrivals. In this case, WIP can be reduced over 60% from its current level while maintaining TAT adherence at the 50% improved rate. Further utilization gains are possible, but only through value stream analysis and enhanced collaboration between functional groups.

Degree

thesis:*
Department dc:contributor.department
Leaders for Global Operations Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Bower, Andrew D. (Andrew Douglas)
Advisor dc:contributor.advisor
  • David Gamarnik and Stanley Gershwin.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/92225
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/92225

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Bower, Andrew D. (Andrew Douglas). Priority queuing for raw material receiving. Massachusetts Institute of Technology, 2014. http://hdl.handle.net/1721.1/92225