The making of a multiple purpose dam : engineering culture, the U.S. Bureau of Reclamation, and Grand Coulee Dam, 1917-1942

Abstract

dc:description.abstract

This dissertation examines how Americans have transformed the environment through the construction of new technologies and the roles of technical professionals in bringing about these changes. In the twentieth century, federal engineers, working with local Western boosters and their federal superiors, transformed the West's waterscape. Between 1900 and 1970, engineers of the U.S. Bureau of Reclamation--only one of three federal agencies that built dams-constructed over 400. On the Columbia River alone, federal engineers constructed thirteen large dams that turned the nation's fourth largest river into a chain of lakes. Engineers wrought this transformation with multiple purpose dams-a new style of dam building in the twentieth century. This style combined a new way of understanding how dams should be used with new approaches to financing the construction of dams and to designing and siting dam structures. Engineers built dams that developed water resources for multiple uses: navigation, flood control, irrigation, and hydroelectricity production. They financed these dams by allocating the costs among uses and then obtaining funds either through federal grants (for navigation and flood control) or loans (for irrigation and hydroelectricity). Engineers frequently designed these dams as traditional concrete gravity structures and sited them at prime locations on major rivers. This work examines the rise of the multiple purpose style of dam building through the history of Grand Coulee Dam. Located on the Columbia River in Washington State, Grand Coulee Dam is one in a group of large dams planned in the 1920s and built in the 1930s during whose design and construction federal engineers worked out this new style of building. It shows that engineers came to prefer this style because it fulfilled conservationists' hopes for "comprehensive planning" of water resources and it eliminated financial problems with federal irrigation activities. Engineers alone did not launch this building program: local constituencies favored development and Franklin Roosevelt's new administration supported relief projects, conservation programs, and government involvement in the electrical industry. Working together, these three groups built a political coalition for multiple purpose dams that successfully underpinned expanded building.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Program in Science, Technology and Society.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2000

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ellison, Karin Denice, 1968-
Advisor dc:contributor.advisor
  • Deborah Fitzgerald.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/9169
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/9169

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Ellison, Karin Denice, 1968-. The making of a multiple purpose dam : engineering culture, the U.S. Bureau of Reclamation, and Grand Coulee Dam, 1917-1942. Massachusetts Institute of Technology, 2000. http://hdl.handle.net/1721.1/9169