Back to results

Massachusetts Institute of Technology

Improving sales and operations planning in an engineer-to-order environment

Abstract

dc:description.abstract

A pragmatic approach is taken at analyzing and improving Sales and Operations Planning in a project based, engineer-to-order product line. Variability of product and components configurations and long lead times of the sales process and of material procurement during project execution place additional planning challenges in comparison with a standardized high volume product business. The study focuses on improving the visibility on future customer orders and on reducing the procurement lead time of project material. Due to the nature of the market and the customers of the studied product line, incoming orders timing is very uncertain when viewed on a project by project basis. However, there is a specific dynamic when the sales pipeline is analyzed on aggregate: Tenders that end up converting into a customer order will do so sooner rather than later. Historical data and observations are used to develop and propose a probabilistic model that connects today's open tenders to the expected new business out of those tenders. The organization is able to use this model to estimate what the current activity of the sales force can produce in terms of new business. The expected benefit is that the organization can act proactively if there is an expected reduction in incoming business from a specific region or major customer; it can also make targeted efforts to increase sales activity towards that region or customer. To increase its competitiveness when bidding for new projects, the organization has embarked on an effort to reduce the overall project execution lead time. A significant portion of this lead time is waiting time for project specific material (which comprises the biggest part of the BOM in money terms). A supplier flexibility scheme is proposed, under which a material order is placed in two phases: first the desired delivery time and the component rough specification are specified, and later on the exact specs are given to the supplier. An optimization model that utilizes the above concept is developed and offers the organization an optimal way to plan the project material procurement, given a desired reduction in procurement lead time. The expected benefit is that there is a justified and optimal method to reduce procurement time without building excessive material stock; it also sheds light to the "constraints" (specific materials or suppliers) that need to be lifted for further lead time reduction.

Degree

thesis:*
Department dc:contributor.department
Leaders for Global Operations Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Christogiannis, Andreas
Advisor dc:contributor.advisor
  • Donald Rosenfield and Michael Triantafyllou.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/90763
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/90763

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Christogiannis, Andreas. Improving sales and operations planning in an engineer-to-order environment. Massachusetts Institute of Technology, 2014. http://hdl.handle.net/1721.1/90763