Back to results

Massachusetts Institute of Technology

Framework and strategies for reducing aircraft lead time

Abstract

dc:description.abstract

Aircraft are complex machines consisting of tens of thousands of parts and assemblies. Due to special engineering requirements, processes, and materials, the lead time for many of the parts can be several months resulting in a long aircraft lead time. During periods of high demand long aircraft lead time is less of a concern since manufacturers often have a large backlog, which is greater than the lead time, allowing them to build the aircraft to order. However, during periods of low demand, manufacturers may need to forecast demand and make the decision to start building aircraft before having a committed customer order. The longer the lead time of the aircraft, the further out into the future the manufacturer has to forecast, which leads to greater uncertainty and variability. In this environment it becomes essential to focus on lead time reduction to allow for better forecasting. Shorter aircraft lead times also have the added benefits of increasing flexibility in production and capacity planning, and lowering inventory holding costs and work in process. Reducing aircraft lead time can often be a difficult task. However, a structured approach to lead time reduction can be very powerful. This paper presents a framework for lead time reduction that is composed of a lead time reduction chart, which provides the correct areas of focus; a strategy flowchart, which identifies the components, strategies, and actions that can be implemented to reduce aircraft lead time; and a summary of reduction strategies that are focused on low rate, complex parts. While the framework is detailed toward aircraft lead time reduction, it is general enough to apply to most supply chain and manufacturing situations. This framework was used during a six month aircraft lead time reduction study at Sikorsky Aircraft Corporation, and analysis reveals that this structured approach was effective at reducing average aircraft lead time by 12.7%.

Degree

thesis:*
Department dc:contributor.department
Leaders for Global Operations Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Marsh, John Andrew, S.M. Massachusetts Institute of Technology
Advisor dc:contributor.advisor
  • Bradley Morrison and Bruce Cameron.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/90755
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/90755

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Marsh, John Andrew, S.M. Massachusetts Institute of Technology. Framework and strategies for reducing aircraft lead time. Massachusetts Institute of Technology, 2014. http://hdl.handle.net/1721.1/90755