{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/90687"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/90687","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Improving the productivity of an R&D organization","abstract":"This research demonstrates through a comprehensive case study, the application of Lean manufacturing techniques, specifically Value Stream Mapping, to a product development organization in the mass consumer products industry. With the guidance of a methodology for Value Stream Mapping adapted to Product Development by Dr. High McManus (McManus, 2005), I map specific processes related to the approval of tests and spending R&D funds. This mapping allows the identification of wastes and improvement in cycle time and in productivity of the process under study. In order to achieve the results above, a precise definition of value and productivity was needed. I derived this from the combination of R&D productivity concepts extracted from the literature that were useful in this application (Tipping, Zeffren, & Fusfeld, 1995), (Steven, Mytelka, & all, 2010), (Meyer, Tertzakian, & Utterback, 1997). Value Stream Mapping also requires the process under study to be precisely bound. In order to narrow the scope of study form the overall product development process to something more manageable, a combination of qualitative interviews with employees and quantitative data from seven past projects was analyzed. This analysis yielded that a significant amount of time was spent by the organization on approval processes. Additionally, procurement processes were highlighted as needing potential improvements. An important conclusion of the work is that approval processes, which are meant to manage and maximize the returns on variable R&D spending, might be counterproductive if we consider their impact on cycle time and the utilization of fixed R&D assets.","abstract_html":"This research demonstrates through a comprehensive case study, the application of Lean manufacturing techniques, specifically Value Stream Mapping, to a product development organization in the mass consumer products industry. With the guidance of a methodology for Value Stream Mapping adapted to Product Development by Dr. High McManus (McManus, 2005), I map specific processes related to the approval of tests and spending R&amp;D funds. This mapping allows the identification of wastes and improvement in cycle time and in productivity of the process under study. In order to achieve the results above, a precise definition of value and productivity was needed. I derived this from the combination of R&amp;D productivity concepts extracted from the literature that were useful in this application (Tipping, Zeffren, &amp; Fusfeld, 1995), (Steven, Mytelka, &amp; all, 2010), (Meyer, Tertzakian, &amp; Utterback, 1997). Value Stream Mapping also requires the process under study to be precisely bound. In order to narrow the scope of study form the overall product development process to something more manageable, a combination of qualitative interviews with employees and quantitative data from seven past projects was analyzed. This analysis yielded that a significant amount of time was spent by the organization on approval processes. Additionally, procurement processes were highlighted as needing potential improvements. An important conclusion of the work is that approval processes, which are meant to manage and maximize the returns on variable R&amp;D spending, might be counterproductive if we consider their impact on cycle time and the utilization of fixed R&amp;D assets.","abstract_has_math":false,"creators":["Hurtado Schwarck, Armando Miguel"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Engineering Systems Division.","school":null,"contributors":[],"advisors":["Ralph Katz."],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013","date_published":"2013","updated_at":"2026-07-22T22:22:27Z","subjects":["Engineering Systems Division.","System Design and Management Program."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/90687","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ralph Katz."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Engineering Systems Division.","System Design and Management Program."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["System Design and Management Program."]},{"key":"dc:creator","label":"Author","values":["Hurtado Schwarck, Armando Miguel"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-10-08T15:22:47Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-10-08T15:22:47Z"]},{"key":"dc:date.issued","label":"Date","values":["2013"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering Systems Division.","System Design and Management Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/90687"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis: S.M. in Engineering and Management, Massachusetts Institute of Technology, Engineering Systems Division, System Design and Management Program, June 2013.","\"May 2013.\" Cataloged from PDF version of thesis.","Includes bibliographical references (pages 85-86)."]},{"key":"dc:description.abstract","label":"Abstract","values":["This research demonstrates through a comprehensive case study, the application of Lean manufacturing techniques, specifically Value Stream Mapping, to a product development organization in the mass consumer products industry. With the guidance of a methodology for Value Stream Mapping adapted to Product Development by Dr. High McManus (McManus, 2005), I map specific processes related to the approval of tests and spending R&D funds. This mapping allows the identification of wastes and improvement in cycle time and in productivity of the process under study. In order to achieve the results above, a precise definition of value and productivity was needed. I derived this from the combination of R&D productivity concepts extracted from the literature that were useful in this application (Tipping, Zeffren, & Fusfeld, 1995), (Steven, Mytelka, & all, 2010), (Meyer, Tertzakian, & Utterback, 1997). Value Stream Mapping also requires the process under study to be precisely bound. In order to narrow the scope of study form the overall product development process to something more manageable, a combination of qualitative interviews with employees and quantitative data from seven past projects was analyzed. This analysis yielded that a significant amount of time was spent by the organization on approval processes. Additionally, procurement processes were highlighted as needing potential improvements. An important conclusion of the work is that approval processes, which are meant to manage and maximize the returns on variable R&D spending, might be counterproductive if we consider their impact on cycle time and the utilization of fixed R&D assets."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M. in Engineering and Management"]},{"key":"dc:title","label":"Title","values":["Improving the productivity of an R&D organization"]}]}],"canonical_facts":{"dc:contributor.advisor":["Ralph Katz."],"dc:contributor.department":["Massachusetts Institute of Technology. Engineering Systems Division.","System Design and Management Program."],"dc:contributor.other":["System Design and Management Program."],"dc:creator":["Hurtado Schwarck, Armando Miguel"],"dc:date.accessioned":["2014-10-08T15:22:47Z"],"dc:date.available":["2014-10-08T15:22:47Z"],"dc:date.issued":["2013"],"dc:description":["Thesis: S.M. in Engineering and Management, Massachusetts Institute of Technology, Engineering Systems Division, System Design and Management Program, June 2013.","\"May 2013.\" Cataloged from PDF version of thesis.","Includes bibliographical references (pages 85-86)."],"dc:description.abstract":["This research demonstrates through a comprehensive case study, the application of Lean manufacturing techniques, specifically Value Stream Mapping, to a product development organization in the mass consumer products industry. With the guidance of a methodology for Value Stream Mapping adapted to Product Development by Dr. High McManus (McManus, 2005), I map specific processes related to the approval of tests and spending R&D funds. This mapping allows the identification of wastes and improvement in cycle time and in productivity of the process under study. In order to achieve the results above, a precise definition of value and productivity was needed. I derived this from the combination of R&D productivity concepts extracted from the literature that were useful in this application (Tipping, Zeffren, & Fusfeld, 1995), (Steven, Mytelka, & all, 2010), (Meyer, Tertzakian, & Utterback, 1997). Value Stream Mapping also requires the process under study to be precisely bound. In order to narrow the scope of study form the overall product development process to something more manageable, a combination of qualitative interviews with employees and quantitative data from seven past projects was analyzed. This analysis yielded that a significant amount of time was spent by the organization on approval processes. Additionally, procurement processes were highlighted as needing potential improvements. An important conclusion of the work is that approval processes, which are meant to manage and maximize the returns on variable R&D spending, might be counterproductive if we consider their impact on cycle time and the utilization of fixed R&D assets."],"dc:description.degree":["S.M. in Engineering and Management"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/90687"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Engineering Systems Division.","System Design and Management Program."],"dc:title":["Improving the productivity of an R&D organization"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:22:27Z"}