Back to results

Massachusetts Institute of Technology

Evaluating foreign Build-Operate-Transfer (BOT) projects using the adjusted net present value (ANPV) method : Thailand's Second Stage Expressway (SES)

Abstract

dc:description.abstract

Accurately incorporating country risks in project evaluation is a complicated process. This thesis presents an evaluation framework, based on a variation of the standard adjusted net present value (ANPV) method, that provides better information about the sources of a foreign project's value and integrates country risks into the evaluation process without distorting the project's intrinsic value. The first half of this thesis focuses on the development of an ANPV framework that is suitable for evaluating foreign projects. Specific guidelines are established to determine whether country risks should be reflected primarily in the project's cash flows or in its discount rate. The second half applies this framework to a privately financed toll road project in Thailand, the Second Stage Expressway (SES). The SES is found to be economically viable even under the most pessimistic scenario, attesting to the project's resilience to country risks. More importantly, the ANPV framework reveals the key sources of the project's value, particularly showing its heavy reliance on a government subsidy for site acquisition. This modified ANPV framework serves as a effective screening device for evaluating the economic worth of foreign projects, particularly Build- Operate- Transfer (BOT) projects. Compared to the NPV, the ANPV framework is a preferred method since it avoids the use of a single discount rate which may distort a foreign project's true economic value. The ANPV framework's use of multiple discount rates and consistent approach to accommodating country risks prevent apparently risky foreign projects from being inadvertently rejected.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Urban Studies and Planning.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
1999

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Tom, Jonathan D. (Jonathan David), 1966-
Advisor dc:contributor.advisor
  • Paul Smoke.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/8960
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/8960

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Tom, Jonathan D. (Jonathan David), 1966-. Evaluating foreign Build-Operate-Transfer (BOT) projects using the adjusted net present value (ANPV) method : Thailand's Second Stage Expressway (SES). Massachusetts Institute of Technology, 1999. http://hdl.handle.net/1721.1/8960