Back to results

Massachusetts Institute of Technology

Capacity planning and change management in an aerospace overhaul cell

Abstract

dc:description.abstract

Purpose - This thesis analyzes the transformation of the Small Components Cell in Pratt & Whitney's aftermarket division through lean manufacturing techniques. The thesis focuses on use of a labor capacity planning model, implementation of a new cell layout, and queuing theory. The project was 6.5 months long, running from June through December of 2012. Findings - In Chapter 4, the capacity planning model shows that demand changes significantly affect cell performance but that the product mix in the cell is even more crucial. The model highlights the best workforce allocations based on a given product mix or demand level. This analysis is expanded in a design of experiment that shows improving employee efficiency is the most effective means of expanding the capacity of the Small Components Cell. Four factors (employee efficiency, absenteeism, overtime, and the duration of employee breaks) have a significant effect on the ultimate capacity of the cell. The design of experiment allows the capacity planning model to be a useful predictive tool. The transformation of the cell into a lean manufacturing flow line requires a significant investment in change management process, including a focus on the logistical details of transformation, continual reinforcement of the vision with the team, and cross-training the workforce. The transformation resulted in a 94% reduction in non-value added part travel, a 72% reduction in flow reversals in the cell, and a 43% reduction in cell exits. Customer satisfaction metrics increase throughout the course of the project as well. Annualized EBIT performance improved by over 40% over the six months of the project, while the costs associated with reworking errors declined by more than 85%. However, on-time delivery of parts to customers failed to meet expectations because of the physical restructuring of the cell and a three month spike in demand which adversely effected cell capacity. Chapter 5 outlines the changes in business metrics, while Chapter 6 discusses recommendations and lessons learned.

Degree

thesis:*
Department dc:contributor.department
Leaders for Global Operations Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2013

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Walker, David, M.B.A. Massachusetts Institute of Technology
Advisor dc:contributor.advisor
  • Zeynep Ton and David Hardt.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/81024
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/81024

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Walker, David, M.B.A. Massachusetts Institute of Technology. Capacity planning and change management in an aerospace overhaul cell. Massachusetts Institute of Technology, 2013. http://hdl.handle.net/1721.1/81024