Back to results

Massachusetts Institute of Technology

Issue resolution at a large aerospace manufacturer

Abstract

dc:description.abstract

UTC Aerospace Systems has a wide variety of problem solving tools driven by their Achieving Competitive Excellence (ACE) program. One tool that is frequently used to resolve and capture customer escapes is the 8D methodology. It is an eight-step process designed to identify, correct, and eliminate recurring problems and is useful in providing a feedback mechanism between the customers and suppliers. Its goal is to establish a permanent corrective action and focuses on the origin of the problem by determining its root causes. The objective of the project is to fully understand the cost benefit of implementing the 8D methodology. The initial investigation of the 8D process uncovered that some defects recorded using the 8D tool are omitted in metrics reporting, leading to poor issue resolution and limited feedback between customers and suppliers. Because the tool requires additional steps that were not required in previous problem solving techniques at UTC Aerospace Systems, it is both more cost and time intensive. To avoid wasteful spending, it is therefore important that the tool be applied only when necessary. A study was performed to identify situations when the 8D tool is used improperly. Two situations were identified: (1) when an 8D investigation is performed unnecessarily and (2) when the 8D investigation is not performed in a situation when it should be. In the first situation, the unnecessary implementation of the 8D tool results in wasted effort within the organization. In the second situation, the missed opportunity to implement the tool has the potential to allow future occurrences of the same defect that may have otherwise been avoided. Preventing a defect from occurring in the future is often achieved by redesigning a part to eliminate a systemic issue. It is therefore important to use the 8D tool in order to identify systemic issues more quickly and thereby reduce future repair costs. The costs associated with these two situations are further quantified in the project.

Degree

thesis:*
Department dc:contributor.department
Leaders for Global Operations Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2013

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Clarke, Sarah (Sarah Kathleen)
Advisor dc:contributor.advisor
  • Roy Welsch and Olivier L. de Weck.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/80986
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/80986

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Clarke, Sarah (Sarah Kathleen). Issue resolution at a large aerospace manufacturer. Massachusetts Institute of Technology, 2013. http://hdl.handle.net/1721.1/80986