{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/77129"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/77129","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Feasibility, benefits and challenges of modular construction in high rise development in the United States : a developer's perspective","abstract":"Modular construction has long been utilized in the construction of residential and many other commercial product types as a means for potentially quicker construction delivery times. Over the past 5 years this construction technique has slowly been introduced into the high rise residential market throughout the world. The additional structural challenges of high rise construction make modular construction in this setting more challenging, but the high construction costs of high rise construction also make any savings in time and hard cost worth consideration. Based on case studies, interviews and financial simulations this thesis will address the design, engineering, sustainability, scheduling, legal and financial considerations a developer would likely consider in adopting modular construction in a high rise project in the United States.","abstract_html":"Modular construction has long been utilized in the construction of residential and many other commercial product types as a means for potentially quicker construction delivery times. Over the past 5 years this construction technique has slowly been introduced into the high rise residential market throughout the world. The additional structural challenges of high rise construction make modular construction in this setting more challenging, but the high construction costs of high rise construction also make any savings in time and hard cost worth consideration. Based on case studies, interviews and financial simulations this thesis will address the design, engineering, sustainability, scheduling, legal and financial considerations a developer would likely consider in adopting modular construction in a high rise project in the United States.","abstract_has_math":false,"creators":["Velamati, Sri"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Center for Real Estate. Program in Real Estate Development.","school":null,"contributors":[],"advisors":["Christopher Gordon."],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012","date_published":"2012","updated_at":"2026-07-22T22:22:26Z","subjects":["Center for Real Estate. Program in Real Estate Development."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/77129","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Christopher Gordon."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Center for Real Estate. Program in Real Estate Development."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Center for Real Estate. Program in Real Estate Development."]},{"key":"dc:creator","label":"Author","values":["Velamati, Sri"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-02-15T14:41:53Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-02-15T14:41:53Z"]},{"key":"dc:date.issued","label":"Date","values":["2012"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Center for Real Estate. Program in Real Estate Development."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/77129"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (S.M. in Real Estate Development)--Massachusetts Institute of Technology, Program in Real Estate Development in Conjunction with the Center for Real Estate, 2012.","Cataloged from department-submitted PDF version of thesis. This electronic version was submitted and approved by the author's academic department as part of an electronic thesis pilot project. The certified thesis is available in the Institute Archives and Special Collections.","Includes bibliographical references (p. 101-102)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Modular construction has long been utilized in the construction of residential and many other commercial product types as a means for potentially quicker construction delivery times. Over the past 5 years this construction technique has slowly been introduced into the high rise residential market throughout the world. The additional structural challenges of high rise construction make modular construction in this setting more challenging, but the high construction costs of high rise construction also make any savings in time and hard cost worth consideration. Based on case studies, interviews and financial simulations this thesis will address the design, engineering, sustainability, scheduling, legal and financial considerations a developer would likely consider in adopting modular construction in a high rise project in the United States."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.in Real Estate Development"]},{"key":"dc:title","label":"Title","values":["Feasibility, benefits and challenges of modular construction in high rise development in the United States : a developer's perspective"]}]}],"canonical_facts":{"dc:contributor.advisor":["Christopher Gordon."],"dc:contributor.department":["Massachusetts Institute of Technology. Center for Real Estate. Program in Real Estate Development."],"dc:contributor.other":["Massachusetts Institute of Technology. Center for Real Estate. Program in Real Estate Development."],"dc:creator":["Velamati, Sri"],"dc:date.accessioned":["2013-02-15T14:41:53Z"],"dc:date.available":["2013-02-15T14:41:53Z"],"dc:date.issued":["2012"],"dc:description":["Thesis (S.M. in Real Estate Development)--Massachusetts Institute of Technology, Program in Real Estate Development in Conjunction with the Center for Real Estate, 2012.","Cataloged from department-submitted PDF version of thesis. This electronic version was submitted and approved by the author's academic department as part of an electronic thesis pilot project. The certified thesis is available in the Institute Archives and Special Collections.","Includes bibliographical references (p. 101-102)."],"dc:description.abstract":["Modular construction has long been utilized in the construction of residential and many other commercial product types as a means for potentially quicker construction delivery times. Over the past 5 years this construction technique has slowly been introduced into the high rise residential market throughout the world. The additional structural challenges of high rise construction make modular construction in this setting more challenging, but the high construction costs of high rise construction also make any savings in time and hard cost worth consideration. Based on case studies, interviews and financial simulations this thesis will address the design, engineering, sustainability, scheduling, legal and financial considerations a developer would likely consider in adopting modular construction in a high rise project in the United States."],"dc:description.degree":["S.M.in Real Estate Development"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/77129"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Center for Real Estate. Program in Real Estate Development."],"dc:title":["Feasibility, benefits and challenges of modular construction in high rise development in the United States : a developer's perspective"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:22:26Z"}