Back to results

Massachusetts Institute of Technology

Waiting for TOD : developing in the Millbrae BART Station Area

Abstract

dc:description.abstract

The suburban terminus station dedicates large amounts of land for parking in order to cater to its driving riders, and causes a trade-off tension between attracting ridership through providing park-and-rides and building transit-oriented development (TOD) within station areas. I focus my research on the Millbrae Intermodal Station, a suburban terminus station in the Bay Area Rapid Transit (BART) system, which is still waiting for a large amount of TOD to occur in its station area. The predominant research question for this thesis is: What are the challenges of creating TOD at suburban terminus stations and how can mixed use, highdensity, and human-scaled environments be better facilitated to become a reality? To answer this question, I took a mixed methods approach that included (1) evaluating ridership and parking supply data of all BART stations, (2) analyzing the primary and contextual case studies by comparing TOD plan documents to the current build-out reality of each station's station area, (3) conducting focused interviews with experts to gain insight on the barriers to implementing TOD at the Millbrae Station, and (4) developing a design proposition of how the Millbrae Station Area could engage alternative uses on its station parking lots. For all of the evaluated stations, parcels immediately approximate to the station had more difficulty realizing TOD than parcels further away from the station. Issues that surfaced as barriers to TOD included weak market conditions, land assemblage, construction costs, parking replacement standards, existing parcel ownership, and existing land use. In addition, TOD plans at more mature stations took an extensive period of time to become realized. To demonstrate how this inevitable waiting period could be more productive, I conclude by proposing design interventions and a strategy for how Millbrae, in the meantime, could apply and experiment with temporary flexible uses on its station parking lots.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Urban Studies and Planning.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2012

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Shih, Janet Wei
Advisor dc:contributor.advisor
  • P. Christopher Zegras.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/73824
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/73824

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Shih, Janet Wei. Waiting for TOD : developing in the Millbrae BART Station Area. Massachusetts Institute of Technology, 2012. http://hdl.handle.net/1721.1/73824