Modeling uncertainty in the New York City no. 7 subway line extension project using Decision Aids for Tunnelling (DAT)

Abstract

dc:description.abstract

Given the frequent cost overruns and schedule delays associated with underground construction projects, it is imperative that a detailed estimate of both be developed and considered prior to starting construction. The Decision Aids for Tunnelling (DAT) allow engineers to consider the uncertainties associated with project ground conditions, construction activities, and problem events, and to determine distributions of total cost and time for completion of construction. This is done by simulating the geological conditions in each DAT simulation and then using the resulting conditions in further simulations of construction processes. As each simulation will only produce one resulting point with a value for cost and a value for time, numerous simulations must be run by the DAT in order to produce a complete scatter gram with a distribution of total possible costs and duration. This thesis utilizes the DAT to develop a distribution for the total cost and duration of constructing the New York City Number 7 Subway Line Extension Project's Running Tunnels using a tunnel boring machine. The results will show the applicability of the DAT, given pre-construction geologic information and post-construction TBM progress data but only total cost. As is to be expected, subsurface conditions were limited to pre-construction baseline information. Despite these limitations, use of available data by the DAT generated a scattergram, forecasting a range of possible cost and duration outcomes.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2012

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hung, Vinnie
Advisor dc:contributor.advisor
  • Herbert H. Einstein.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/73787
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/73787

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Hung, Vinnie. Modeling uncertainty in the New York City no. 7 subway line extension project using Decision Aids for Tunnelling (DAT). Massachusetts Institute of Technology, 2012. http://hdl.handle.net/1721.1/73787