Back to results

Massachusetts Institute of Technology

Project process mapping : evaluation, selection, implementation, and assessment of energy cost reduction opportunities in Manufacturing

Abstract

dc:description.abstract

Company X uses large amounts of electricity in its manufacturing operations. Electricity prices at selected plants in the company's Region 1 territory rose by over 350% between 2000 and 2011, in part due to increasing reliance on high-cost fossil fuels. A focus on reducing these costs has identified numerous energy-saving projects in recent years, but with mixed implementation and performance results between the different plants in the region. Consequently, there is both a need to reduce exposure to high electricity prices and an opportunity to better share best-use practices between plants. This paper has two focuses: identifying and quantifying energy cost-reduction opportunities, and mapping the value-streams for the decision-making and implementation process for energy savings projects. From this Value Stream Map, recommendations are made for a new process that can be standardized and rolled out to other sites in the region. During the first phase of the project, data gathered from utility bills, power meters, and production records are used to identify the best opportunities for energy reduction within the plants. Using this technique, 7 GWh/year of potential energy cost savings are identified via reduced downtime, lighting motion detectors, high-efficiency lighting, and negotiable changes to energy contracts. For the benchmarking phase, the historical record of identified energy projects is compared with the number of projects actually implemented. An observational study of the local LEAN team from one plant is combined with interviews of engineers, managers, and financial analysts to build a process map of both the current and former processes for energy project identification, evaluation, and implementation. The results show a reduction in process steps and a step-change increase in the number of energy projects implemented. A key feature of the new approach is the creation of a dedicated energy team within the existing LEAN program. It is believed that emulating this integration of energy and LEAN at other sites will yield cost reductions as well. To follow up this work, a pilot study modeling this program at another site is recommended before further expansion to the rest of the region.

Degree

thesis:*
Department dc:contributor.department
Leaders for Global Operations Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2012

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Stoddard, Steven J
Advisor dc:contributor.advisor
  • Roy E. Welsch and Randolph E. Kirchain, Jr.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/73418
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/73418

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Stoddard, Steven J. Project process mapping : evaluation, selection, implementation, and assessment of energy cost reduction opportunities in Manufacturing. Massachusetts Institute of Technology, 2012. http://hdl.handle.net/1721.1/73418