{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/73395"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/73395","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Driving cycle time reduction through an improved material flow process in the electronics assembly manufacturing cell","abstract":"Many companies have implemented lean and six sigma programs over the past twenty years. Lean has been a proven system that has eliminated waste and created value at many companies throughout the world. Raytheon IDS's lean program, \"Raytheon Six Sigma\" became a top priority in the past ten years at the Integrated Air Defense Center (IADC) in Andover, MA. However, as Raytheon's corporate goals state, they want to take this further and bring \"Raytheon Six Sigma\" to the next level, fully engaging customers and partners. A focus of this continuous improvement effort was the Electronics Assembly Rack manufacturing cell, which was experiencing high levels of cycle time variability. To help reduce cycle times within the cell, a continuous improvement project was undertaken to improve the material flow process. A current state analysis of the process showed an opportunity to improve process standardization and prioritization while lowering inventory levels. In addition to working with managers from EA to evaluate the material flow process, a kitting cart was developed with a cross functional project team to serve as a tool to help improve the process. Although the improvements were not rolled out to the entire cell during the project, a successful pilot was conducted that helped improve engagement with operators and create a path for future success.","abstract_html":"Many companies have implemented lean and six sigma programs over the past twenty years. Lean has been a proven system that has eliminated waste and created value at many companies throughout the world. Raytheon IDS&#x27;s lean program, &quot;Raytheon Six Sigma&quot; became a top priority in the past ten years at the Integrated Air Defense Center (IADC) in Andover, MA. However, as Raytheon&#x27;s corporate goals state, they want to take this further and bring &quot;Raytheon Six Sigma&quot; to the next level, fully engaging customers and partners. A focus of this continuous improvement effort was the Electronics Assembly Rack manufacturing cell, which was experiencing high levels of cycle time variability. To help reduce cycle times within the cell, a continuous improvement project was undertaken to improve the material flow process. A current state analysis of the process showed an opportunity to improve process standardization and prioritization while lowering inventory levels. In addition to working with managers from EA to evaluate the material flow process, a kitting cart was developed with a cross functional project team to serve as a tool to help improve the process. Although the improvements were not rolled out to the entire cell during the project, a successful pilot was conducted that helped improve engagement with operators and create a path for future success.","abstract_has_math":false,"creators":["Millerd, Paul, M.B.A. Massachusetts Institute of Technology."],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Leaders for Global Operations Program at MIT","school":null,"contributors":[],"advisors":["Roy Welsch and Daniel Whitney."],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012","date_published":"2012","updated_at":"2026-07-22T22:21:34Z","subjects":["Sloan School of Management.","Engineering Systems Division.","Leaders for Global Operations Program."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/73395","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Roy Welsch and Daniel Whitney."]},{"key":"dc:contributor.department","label":"Department","values":["Leaders for Global Operations Program at MIT","Massachusetts Institute of Technology. Engineering Systems Division","Sloan School of Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Leaders for Global Operations Program."]},{"key":"dc:creator","label":"Author","values":["Millerd, Paul, M.B.A. Massachusetts Institute of Technology."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-09-27T15:28:58Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-09-27T15:28:58Z"]},{"key":"dc:date.issued","label":"Date","values":["2012"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Sloan School of Management.","Engineering Systems Division.","Leaders for Global Operations Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/73395"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Global Operations Program at MIT, 2012.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 62)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Many companies have implemented lean and six sigma programs over the past twenty years. Lean has been a proven system that has eliminated waste and created value at many companies throughout the world. Raytheon IDS's lean program, \"Raytheon Six Sigma\" became a top priority in the past ten years at the Integrated Air Defense Center (IADC) in Andover, MA. However, as Raytheon's corporate goals state, they want to take this further and bring \"Raytheon Six Sigma\" to the next level, fully engaging customers and partners. A focus of this continuous improvement effort was the Electronics Assembly Rack manufacturing cell, which was experiencing high levels of cycle time variability. To help reduce cycle times within the cell, a continuous improvement project was undertaken to improve the material flow process. A current state analysis of the process showed an opportunity to improve process standardization and prioritization while lowering inventory levels. In addition to working with managers from EA to evaluate the material flow process, a kitting cart was developed with a cross functional project team to serve as a tool to help improve the process. Although the improvements were not rolled out to the entire cell during the project, a successful pilot was conducted that helped improve engagement with operators and create a path for future success."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.","M.B.A."]},{"key":"dc:title","label":"Title","values":["Driving cycle time reduction through an improved material flow process in the electronics assembly manufacturing cell"]}]}],"canonical_facts":{"dc:contributor.advisor":["Roy Welsch and Daniel Whitney."],"dc:contributor.department":["Leaders for Global Operations Program at MIT","Massachusetts Institute of Technology. Engineering Systems Division","Sloan School of Management"],"dc:contributor.other":["Leaders for Global Operations Program."],"dc:creator":["Millerd, Paul, M.B.A. Massachusetts Institute of Technology."],"dc:date.accessioned":["2012-09-27T15:28:58Z"],"dc:date.available":["2012-09-27T15:28:58Z"],"dc:date.issued":["2012"],"dc:description":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Global Operations Program at MIT, 2012.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 62)."],"dc:description.abstract":["Many companies have implemented lean and six sigma programs over the past twenty years. Lean has been a proven system that has eliminated waste and created value at many companies throughout the world. Raytheon IDS's lean program, \"Raytheon Six Sigma\" became a top priority in the past ten years at the Integrated Air Defense Center (IADC) in Andover, MA. However, as Raytheon's corporate goals state, they want to take this further and bring \"Raytheon Six Sigma\" to the next level, fully engaging customers and partners. A focus of this continuous improvement effort was the Electronics Assembly Rack manufacturing cell, which was experiencing high levels of cycle time variability. To help reduce cycle times within the cell, a continuous improvement project was undertaken to improve the material flow process. A current state analysis of the process showed an opportunity to improve process standardization and prioritization while lowering inventory levels. In addition to working with managers from EA to evaluate the material flow process, a kitting cart was developed with a cross functional project team to serve as a tool to help improve the process. Although the improvements were not rolled out to the entire cell during the project, a successful pilot was conducted that helped improve engagement with operators and create a path for future success."],"dc:description.degree":["S.M.","M.B.A."],"dc:identifier.uri":["http://hdl.handle.net/1721.1/73395"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Sloan School of Management.","Engineering Systems Division.","Leaders for Global Operations Program."],"dc:title":["Driving cycle time reduction through an improved material flow process in the electronics assembly manufacturing cell"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:21:34Z"}