{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/73379"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/73379","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"A proposed approach to assess supply chain risks to meet the new challenges in the Defense industry","abstract":"Department of Defense (DoD) had doubled its planned investments in new weapon systems from about $700 billion in 2001 to nearly $1.4 trillion in 2006. Despite the technical superiority of its weapon systems, DoD's weapon systems acquisition process had been plagued with cost increases, schedule delays, and performance shortfalls'. To address the maturity gaps, DoD mandated in 2008 that all prime contractors (including Raytheon) for new US government funded defense programs to evaluate/document technology and manufacturing readiness levels (T/MRL) of their supply base. There are 10 manufacturing & 9 technology readiness levels and specific levels need to be met for certain program milestones. DoD has released a set of questionnaires (Deskbooks), designed to evaluate the maturity levels of a supplier in areas such as engineering design, operation, manufacturing, and facility etc. The goal of this thesis is to develop an assessment method, using the Deskbooks as a reference, to address the core issues in the defense acquisition process. The thesis will also take a deep dive into Raytheon's supply chain management philosophy and analyze how Raytheon's strategic sourcing initiatives align with the new challenges in the defense industry.","abstract_html":"Department of Defense (DoD) had doubled its planned investments in new weapon systems from about $700 billion in 2001 to nearly $1.4 trillion in 2006. Despite the technical superiority of its weapon systems, DoD&#x27;s weapon systems acquisition process had been plagued with cost increases, schedule delays, and performance shortfalls&#x27;. To address the maturity gaps, DoD mandated in 2008 that all prime contractors (including Raytheon) for new US government funded defense programs to evaluate/document technology and manufacturing readiness levels (T/MRL) of their supply base. There are 10 manufacturing &amp; 9 technology readiness levels and specific levels need to be met for certain program milestones. DoD has released a set of questionnaires (Deskbooks), designed to evaluate the maturity levels of a supplier in areas such as engineering design, operation, manufacturing, and facility etc. The goal of this thesis is to develop an assessment method, using the Deskbooks as a reference, to address the core issues in the defense acquisition process. The thesis will also take a deep dive into Raytheon&#x27;s supply chain management philosophy and analyze how Raytheon&#x27;s strategic sourcing initiatives align with the new challenges in the defense industry.","abstract_has_math":true,"creators":["Chou, Cheng-Lung (Cheng-Lung John)"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Leaders for Global Operations Program at MIT","school":null,"contributors":[],"advisors":["Roy E. Welsch and Daniel E. Whitney."],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012","date_published":"2012","updated_at":"2026-07-22T22:21:07Z","subjects":["Sloan School of Management.","Engineering Systems Division.","Leaders for Global Operations Program."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/73379","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Roy E. Welsch and Daniel E. Whitney."]},{"key":"dc:contributor.department","label":"Department","values":["Leaders for Global Operations Program at MIT","Massachusetts Institute of Technology. Engineering Systems Division","Sloan School of Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Leaders for Global Operations Program."]},{"key":"dc:creator","label":"Author","values":["Chou, Cheng-Lung (Cheng-Lung John)"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-09-27T15:27:10Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-09-27T15:27:10Z"]},{"key":"dc:date.issued","label":"Date","values":["2012"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Sloan School of Management.","Engineering Systems Division.","Leaders for Global Operations Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/73379"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Global Operations Program at MIT, 2012.","Cataloged from PDF version of thesis. Page 68 is blank.","Includes bibliographical references (p. 65-66)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Department of Defense (DoD) had doubled its planned investments in new weapon systems from about $700 billion in 2001 to nearly $1.4 trillion in 2006. Despite the technical superiority of its weapon systems, DoD's weapon systems acquisition process had been plagued with cost increases, schedule delays, and performance shortfalls'. To address the maturity gaps, DoD mandated in 2008 that all prime contractors (including Raytheon) for new US government funded defense programs to evaluate/document technology and manufacturing readiness levels (T/MRL) of their supply base. There are 10 manufacturing & 9 technology readiness levels and specific levels need to be met for certain program milestones. DoD has released a set of questionnaires (Deskbooks), designed to evaluate the maturity levels of a supplier in areas such as engineering design, operation, manufacturing, and facility etc. The goal of this thesis is to develop an assessment method, using the Deskbooks as a reference, to address the core issues in the defense acquisition process. The thesis will also take a deep dive into Raytheon's supply chain management philosophy and analyze how Raytheon's strategic sourcing initiatives align with the new challenges in the defense industry."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.","M.B.A."]},{"key":"dc:title","label":"Title","values":["A proposed approach to assess supply chain risks to meet the new challenges in the Defense industry"]}]}],"canonical_facts":{"dc:contributor.advisor":["Roy E. Welsch and Daniel E. Whitney."],"dc:contributor.department":["Leaders for Global Operations Program at MIT","Massachusetts Institute of Technology. Engineering Systems Division","Sloan School of Management"],"dc:contributor.other":["Leaders for Global Operations Program."],"dc:creator":["Chou, Cheng-Lung (Cheng-Lung John)"],"dc:date.accessioned":["2012-09-27T15:27:10Z"],"dc:date.available":["2012-09-27T15:27:10Z"],"dc:date.issued":["2012"],"dc:description":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Global Operations Program at MIT, 2012.","Cataloged from PDF version of thesis. Page 68 is blank.","Includes bibliographical references (p. 65-66)."],"dc:description.abstract":["Department of Defense (DoD) had doubled its planned investments in new weapon systems from about $700 billion in 2001 to nearly $1.4 trillion in 2006. Despite the technical superiority of its weapon systems, DoD's weapon systems acquisition process had been plagued with cost increases, schedule delays, and performance shortfalls'. To address the maturity gaps, DoD mandated in 2008 that all prime contractors (including Raytheon) for new US government funded defense programs to evaluate/document technology and manufacturing readiness levels (T/MRL) of their supply base. There are 10 manufacturing & 9 technology readiness levels and specific levels need to be met for certain program milestones. DoD has released a set of questionnaires (Deskbooks), designed to evaluate the maturity levels of a supplier in areas such as engineering design, operation, manufacturing, and facility etc. The goal of this thesis is to develop an assessment method, using the Deskbooks as a reference, to address the core issues in the defense acquisition process. The thesis will also take a deep dive into Raytheon's supply chain management philosophy and analyze how Raytheon's strategic sourcing initiatives align with the new challenges in the defense industry."],"dc:description.degree":["S.M.","M.B.A."],"dc:identifier.uri":["http://hdl.handle.net/1721.1/73379"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Sloan School of Management.","Engineering Systems Division.","Leaders for Global Operations Program."],"dc:title":["A proposed approach to assess supply chain risks to meet the new challenges in the Defense industry"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:21:07Z"}