Back to results

Massachusetts Institute of Technology

A chronological probabilistic production cost model to evaluate the reliability contribution of limited energy plants

Abstract

dc:description.abstract

The growth of renewables in power systems has reinvigorated research and regulatory interest in reliability analysis algorithms such as the Baleriaux/Booth convolution-based probabilistic production cost (PPC) model. However, while these traditional PPC algorithms can reasonably represent thermal plant availabilities, they do not accurately represent limited energy plants because of their generic treatment of time. In particular, in systems with limited energy plants, convolution-based PPC models tend to underestimate the loss-of-load probability and expected nonserved energy. This thesis illustrates the chronological challenges of the traditional convolution-based PPC, proposes a modification that improves the representation of chronological elements, explores the reliability contribution of LEPs using the new algorithm, and demonstrates two regulatory applications by calculating a capacity payment for an LEP and the expected-load-carrying-capability metric for any generator. To the best knowledge of the author, the introduction of multiple hydro plants with different capacity constraints and the calculations for marginal probabilities, prices, and revenues to a chronological PPC model are novel.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Engineering Systems Division.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2012

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Leung, Tommy (Tommy Chun Ting)
Advisor dc:contributor.advisor
  • Ignacio J. Prez Arriaga and Carlos Batlle.

Subjects

dc:subject × 2

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/72895
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/72895

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Leung, Tommy (Tommy Chun Ting). A chronological probabilistic production cost model to evaluate the reliability contribution of limited energy plants. Massachusetts Institute of Technology, 2012. http://hdl.handle.net/1721.1/72895