Back to results

Massachusetts Institute of Technology

Molding the unshapely structure : rebuilding Boston Chinatown

Abstract

dc:description.abstract

This study is an attempt to interpret and comprehend the development pattern of urban form in an ethnic community, in this case Boston Chinatown. The study does not propose a detailed urban design framework but calls for a sensitivity in future design interventions for strengthening the cohesive character of the district. . Contrary to conventional planning approaches which aim to regularize and integrate ethnic districts such as Chinatown into the 'city fabric', this thesis suggests a more cautious strategy in which the peculiarities of the 'unshapely' structure of the area are seen as opportunities to enhance and maintain its identity. The thesis acknowledges an organic wholeness of Chinatown where the physical structure is subservient to and a result of a complex network of vital socio-cultural processes. An increased awareness of these factors is essential in formulating future urban design guidelines for the remodeling and up gradation of the Chinatown district.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Architecture.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
1994

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Lim, Meng Howe
Advisor dc:contributor.advisor
  • Michael Dennis.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/68288
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/68288

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Lim, Meng Howe. Molding the unshapely structure : rebuilding Boston Chinatown. Massachusetts Institute of Technology, 1994. http://hdl.handle.net/1721.1/68288