{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/62505"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/62505","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Assembly cell layout and Kanban system design for an oilfield services company","abstract":"The thesis describes the layout design of new gauge assembly lab for an oilfield services company. A relationship diagram was created to categorize all the workstations and activities in the assembly line. Three layouts were proposed based on the categorization. One layout that facilitated the assembly flow best and met the requirement of human factors was selected. This new layout enables the company to meet the increased demand in 2011. In addition, Kanban system was also introduced to this assembly line to reduce lead time to one month and to reduce inventory by 40%, respectively.","abstract_html":"The thesis describes the layout design of new gauge assembly lab for an oilfield services company. A relationship diagram was created to categorize all the workstations and activities in the assembly line. Three layouts were proposed based on the categorization. One layout that facilitated the assembly flow best and met the requirement of human factors was selected. This new layout enables the company to meet the increased demand in 2011. In addition, Kanban system was also introduced to this assembly line to reduce lead time to one month and to reduce inventory by 40%, respectively.","abstract_has_math":false,"creators":["Liu, Junying, M. Eng. Massachusetts Institute of Technology"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Dept. of Mechanical Engineering.","school":null,"contributors":[],"advisors":["Kamal Youcef-Toumi."],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010","date_published":"2010","updated_at":"2026-07-22T22:22:29Z","subjects":["Mechanical Engineering."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/62505","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kamal Youcef-Toumi."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:creator","label":"Author","values":["Liu, Junying, M. Eng. Massachusetts Institute of Technology"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2011-04-25T16:10:15Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2011-04-25T16:10:15Z"]},{"key":"dc:date.issued","label":"Date","values":["2010"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mechanical Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/62505"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 46)."]},{"key":"dc:description.abstract","label":"Abstract","values":["The thesis describes the layout design of new gauge assembly lab for an oilfield services company. A relationship diagram was created to categorize all the workstations and activities in the assembly line. Three layouts were proposed based on the categorization. One layout that facilitated the assembly flow best and met the requirement of human factors was selected. This new layout enables the company to meet the increased demand in 2011. In addition, Kanban system was also introduced to this assembly line to reduce lead time to one month and to reduce inventory by 40%, respectively."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.Eng."]},{"key":"dc:title","label":"Title","values":["Assembly cell layout and Kanban system design for an oilfield services company"]}]}],"canonical_facts":{"dc:contributor.advisor":["Kamal Youcef-Toumi."],"dc:contributor.department":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:creator":["Liu, Junying, M. Eng. Massachusetts Institute of Technology"],"dc:date.accessioned":["2011-04-25T16:10:15Z"],"dc:date.available":["2011-04-25T16:10:15Z"],"dc:date.issued":["2010"],"dc:description":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 46)."],"dc:description.abstract":["The thesis describes the layout design of new gauge assembly lab for an oilfield services company. A relationship diagram was created to categorize all the workstations and activities in the assembly line. Three layouts were proposed based on the categorization. One layout that facilitated the assembly flow best and met the requirement of human factors was selected. This new layout enables the company to meet the increased demand in 2011. In addition, Kanban system was also introduced to this assembly line to reduce lead time to one month and to reduce inventory by 40%, respectively."],"dc:description.degree":["M.Eng."],"dc:identifier.uri":["http://hdl.handle.net/1721.1/62505"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Mechanical Engineering."],"dc:title":["Assembly cell layout and Kanban system design for an oilfield services company"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:22:29Z"}