Back to results

Massachusetts Institute of Technology

Manpower planning and cycle-time reduction of a labor-intensive assembly line

Abstract

dc:description.abstract

The demand for Gas Lift Mandrels(GLM) in the oil and gas industry is expected to increase over the next few years, requiring Schlumberger's GLM assembly line to increase their manufacturing capacity. Given the labor-intensive nature of Schlumberger's GLM assembly line, other than implementing kaizens and purchasing more equipment, it is important to also consider manpower issues. This research analyzes manpower management issues in the GLM assembly line to meet the projected increase in customer demand over the next three years. A detailed time study was conducted to understand and characterize all processes in the assembly line, before manpower plans were drawn up for each year till 2013. Several manpower scheduling concepts were incorporated in the manpower plan, such as Job Rotation and Workforce Flexibility to optimize the rate of utilization, human performance and well-being. By clustering processes together, the labor utilization rate can be increased to more than ninety percent. A new position of grinders has also been proposed to assist in various grinding operations, in order to reduce the cycle times of processes, to help workers gain better focus in their work and to reduce the cost of labor.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2010

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Oh, Shao Chong
Advisor dc:contributor.advisor
  • Stephen C. Graves.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/62504
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/62504

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Oh, Shao Chong. Manpower planning and cycle-time reduction of a labor-intensive assembly line. Massachusetts Institute of Technology, 2010. http://hdl.handle.net/1721.1/62504