{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/62503"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/62503","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Kaizen events implementation for cycle time reduction in gauge production line","abstract":"This thesis describes the implementation of three Kaizen events designed to improve efficiency on a gauge production line which consists of both semiconductor and mechanical equipment for manufacturing complex products with low volume and high configuration mix. A kitting process design reduced cycle time by 12 minutes in the mechanical assembly and by 3 minutes in the packing. A redesigned fixture improved loading and unloading time at the auto calibration. Use of this fixture decreased setup and dismantlement in one batch by 16 minutes. A newly designed jig made multiple loading available in batch of 8 at the vibration test, in which case, 17.5 minutes were reduced from the cycle time.","abstract_html":"This thesis describes the implementation of three Kaizen events designed to improve efficiency on a gauge production line which consists of both semiconductor and mechanical equipment for manufacturing complex products with low volume and high configuration mix. A kitting process design reduced cycle time by 12 minutes in the mechanical assembly and by 3 minutes in the packing. A redesigned fixture improved loading and unloading time at the auto calibration. Use of this fixture decreased setup and dismantlement in one batch by 16 minutes. A newly designed jig made multiple loading available in batch of 8 at the vibration test, in which case, 17.5 minutes were reduced from the cycle time.","abstract_has_math":false,"creators":["Liu, Ren, M. Eng. Massachusetts Institute of Technology"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Dept. of Mechanical Engineering.","school":null,"contributors":[],"advisors":["Kamal Youcef-Toumi."],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010","date_published":"2010","updated_at":"2026-07-22T22:22:19Z","subjects":["Mechanical Engineering."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/62503","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kamal Youcef-Toumi."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:creator","label":"Author","values":["Liu, Ren, M. Eng. Massachusetts Institute of Technology"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2011-04-25T16:09:56Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2011-04-25T16:09:56Z"]},{"key":"dc:date.issued","label":"Date","values":["2010"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mechanical Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/62503"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 62)."]},{"key":"dc:description.abstract","label":"Abstract","values":["This thesis describes the implementation of three Kaizen events designed to improve efficiency on a gauge production line which consists of both semiconductor and mechanical equipment for manufacturing complex products with low volume and high configuration mix. A kitting process design reduced cycle time by 12 minutes in the mechanical assembly and by 3 minutes in the packing. A redesigned fixture improved loading and unloading time at the auto calibration. Use of this fixture decreased setup and dismantlement in one batch by 16 minutes. A newly designed jig made multiple loading available in batch of 8 at the vibration test, in which case, 17.5 minutes were reduced from the cycle time."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.Eng."]},{"key":"dc:title","label":"Title","values":["Kaizen events implementation for cycle time reduction in gauge production line"]}]}],"canonical_facts":{"dc:contributor.advisor":["Kamal Youcef-Toumi."],"dc:contributor.department":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:creator":["Liu, Ren, M. Eng. Massachusetts Institute of Technology"],"dc:date.accessioned":["2011-04-25T16:09:56Z"],"dc:date.available":["2011-04-25T16:09:56Z"],"dc:date.issued":["2010"],"dc:description":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 62)."],"dc:description.abstract":["This thesis describes the implementation of three Kaizen events designed to improve efficiency on a gauge production line which consists of both semiconductor and mechanical equipment for manufacturing complex products with low volume and high configuration mix. A kitting process design reduced cycle time by 12 minutes in the mechanical assembly and by 3 minutes in the packing. A redesigned fixture improved loading and unloading time at the auto calibration. Use of this fixture decreased setup and dismantlement in one batch by 16 minutes. A newly designed jig made multiple loading available in batch of 8 at the vibration test, in which case, 17.5 minutes were reduced from the cycle time."],"dc:description.degree":["M.Eng."],"dc:identifier.uri":["http://hdl.handle.net/1721.1/62503"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Mechanical Engineering."],"dc:title":["Kaizen events implementation for cycle time reduction in gauge production line"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:22:19Z"}