{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/62494"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/62494","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Control of WIP and reduction of lead time in a food packaging company","abstract":"High inventory holding costs, strain on warehouse capacity and the competition of lead time are concerns of a food packaging manufacturer. In this work, causes of high WIP were identified and three approaches were developed to reduce and control better the WIP. We propose to split the production line into dedicated lines, to change the push production system to a pull production system, and to align the process times to the takt time. A simulation model of the proposed production line was analyzed and was verified by a simulation model of the current production line. Three configurations were tested for production line A and production line B. We found that the proposed production line reduced the WIP by 70% and saved $990,000 annually in inventory holding costs. In addition, the lead time was reduced from 6.4 days to 1.9 days and the strain on the warehouse capacity was eliminated.","abstract_html":"High inventory holding costs, strain on warehouse capacity and the competition of lead time are concerns of a food packaging manufacturer. In this work, causes of high WIP were identified and three approaches were developed to reduce and control better the WIP. We propose to split the production line into dedicated lines, to change the push production system to a pull production system, and to align the process times to the takt time. A simulation model of the proposed production line was analyzed and was verified by a simulation model of the current production line. Three configurations were tested for production line A and production line B. We found that the proposed production line reduced the WIP by 70% and saved $990,000 annually in inventory holding costs. In addition, the lead time was reduced from 6.4 days to 1.9 days and the strain on the warehouse capacity was eliminated.","abstract_has_math":false,"creators":["Chim, Kevan Yong Cai"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Dept. of Mechanical Engineering.","school":null,"contributors":[],"advisors":["Stephen C. Graves."],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010","date_published":"2010","updated_at":"2026-07-22T22:22:02Z","subjects":["Mechanical Engineering."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/62494","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Stephen C. Graves."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:creator","label":"Author","values":["Chim, Kevan Yong Cai"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2011-04-25T16:08:24Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2011-04-25T16:08:24Z"]},{"key":"dc:date.issued","label":"Date","values":["2010"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mechanical Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/62494"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 71)."]},{"key":"dc:description.abstract","label":"Abstract","values":["High inventory holding costs, strain on warehouse capacity and the competition of lead time are concerns of a food packaging manufacturer. In this work, causes of high WIP were identified and three approaches were developed to reduce and control better the WIP. We propose to split the production line into dedicated lines, to change the push production system to a pull production system, and to align the process times to the takt time. A simulation model of the proposed production line was analyzed and was verified by a simulation model of the current production line. Three configurations were tested for production line A and production line B. We found that the proposed production line reduced the WIP by 70% and saved $990,000 annually in inventory holding costs. In addition, the lead time was reduced from 6.4 days to 1.9 days and the strain on the warehouse capacity was eliminated."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.Eng."]},{"key":"dc:title","label":"Title","values":["Control of WIP and reduction of lead time in a food packaging company"]}]}],"canonical_facts":{"dc:contributor.advisor":["Stephen C. Graves."],"dc:contributor.department":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:creator":["Chim, Kevan Yong Cai"],"dc:date.accessioned":["2011-04-25T16:08:24Z"],"dc:date.available":["2011-04-25T16:08:24Z"],"dc:date.issued":["2010"],"dc:description":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 71)."],"dc:description.abstract":["High inventory holding costs, strain on warehouse capacity and the competition of lead time are concerns of a food packaging manufacturer. In this work, causes of high WIP were identified and three approaches were developed to reduce and control better the WIP. We propose to split the production line into dedicated lines, to change the push production system to a pull production system, and to align the process times to the takt time. A simulation model of the proposed production line was analyzed and was verified by a simulation model of the current production line. Three configurations were tested for production line A and production line B. We found that the proposed production line reduced the WIP by 70% and saved $990,000 annually in inventory holding costs. In addition, the lead time was reduced from 6.4 days to 1.9 days and the strain on the warehouse capacity was eliminated."],"dc:description.degree":["M.Eng."],"dc:identifier.uri":["http://hdl.handle.net/1721.1/62494"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Mechanical Engineering."],"dc:title":["Control of WIP and reduction of lead time in a food packaging company"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:22:02Z"}