{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/59260"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/59260","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Is specialization the most effective solution to overload? : a system dynamics exploration of a product development organization","abstract":"This work investigates the overload problems of one product development department in a consumer products company. Many in the organization attribute the problem to an external source - a burgeoning product portfolio. The most common solution posed is to split the department into two in order to reap the productivity gains of specialization and reduce the overload. It is proposed that some of the overload is internally generated and specialization alone will not be enough. There is a Reinventing the Wheel phenomenon that occurs when projects are handed off from one person to another. Additional work is generated with each hand off. This problem can be exacerbated by high turnover, lack of documentation, switch loss, or delays in project completion. System dynamics models were created to explore the feedback loops, delayed effects of managerial decisions and resulting behavior of the system. Results showed that specialization leads to initially high productivity, but the gains decrease over time as breadth of experience across the organization decays and rework and coordination costs increase. It is also shown that overload could be internally generated through managerial policies. If these policies are not changed, specializing may not be as effective. Recommendations include considering turnover as part of project planning and carefully monitoring workload so that the productivity does not plummet and affect all programs. Specialization is a good solution in some cases, but is not the best solution for work that requires a great deal of interaction between functions, where the level of coordination required to share knowledge outweighs the productivity gains.","abstract_html":"This work investigates the overload problems of one product development department in a consumer products company. Many in the organization attribute the problem to an external source - a burgeoning product portfolio. The most common solution posed is to split the department into two in order to reap the productivity gains of specialization and reduce the overload. It is proposed that some of the overload is internally generated and specialization alone will not be enough. There is a Reinventing the Wheel phenomenon that occurs when projects are handed off from one person to another. Additional work is generated with each hand off. This problem can be exacerbated by high turnover, lack of documentation, switch loss, or delays in project completion. System dynamics models were created to explore the feedback loops, delayed effects of managerial decisions and resulting behavior of the system. Results showed that specialization leads to initially high productivity, but the gains decrease over time as breadth of experience across the organization decays and rework and coordination costs increase. It is also shown that overload could be internally generated through managerial policies. If these policies are not changed, specializing may not be as effective. Recommendations include considering turnover as part of project planning and carefully monitoring workload so that the productivity does not plummet and affect all programs. Specialization is a good solution in some cases, but is not the best solution for work that requires a great deal of interaction between functions, where the level of coordination required to share knowledge outweighs the productivity gains.","abstract_has_math":false,"creators":["Nguyen, Linda T. (Linda Thi)"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Engineering Systems Division.","school":null,"contributors":[],"advisors":["J. Bradley Morrison."],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010","date_published":"2010","updated_at":"2026-07-22T22:21:20Z","subjects":["Engineering Systems Division.","System Design and Management Program."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/59260","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["J. Bradley Morrison."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Engineering Systems Division.","System Design and Management Program."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["System Design and Management Program."]},{"key":"dc:creator","label":"Author","values":["Nguyen, Linda T. (Linda Thi)"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2010-10-12T18:59:46Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2010-10-12T18:59:46Z"]},{"key":"dc:date.issued","label":"Date","values":["2010"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering Systems Division.","System Design and Management Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/59260"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (S.M. in System Design and Management)--Massachusetts Institute of Technology, Engineering Systems Division, 2010.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 86-87)."]},{"key":"dc:description.abstract","label":"Abstract","values":["This work investigates the overload problems of one product development department in a consumer products company. Many in the organization attribute the problem to an external source - a burgeoning product portfolio. The most common solution posed is to split the department into two in order to reap the productivity gains of specialization and reduce the overload. It is proposed that some of the overload is internally generated and specialization alone will not be enough. There is a Reinventing the Wheel phenomenon that occurs when projects are handed off from one person to another. Additional work is generated with each hand off. This problem can be exacerbated by high turnover, lack of documentation, switch loss, or delays in project completion. System dynamics models were created to explore the feedback loops, delayed effects of managerial decisions and resulting behavior of the system. Results showed that specialization leads to initially high productivity, but the gains decrease over time as breadth of experience across the organization decays and rework and coordination costs increase. It is also shown that overload could be internally generated through managerial policies. If these policies are not changed, specializing may not be as effective. Recommendations include considering turnover as part of project planning and carefully monitoring workload so that the productivity does not plummet and affect all programs. Specialization is a good solution in some cases, but is not the best solution for work that requires a great deal of interaction between functions, where the level of coordination required to share knowledge outweighs the productivity gains."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.in System Design and Management"]},{"key":"dc:title","label":"Title","values":["Is specialization the most effective solution to overload? : a system dynamics exploration of a product development organization"]}]}],"canonical_facts":{"dc:contributor.advisor":["J. Bradley Morrison."],"dc:contributor.department":["Massachusetts Institute of Technology. Engineering Systems Division.","System Design and Management Program."],"dc:contributor.other":["System Design and Management Program."],"dc:creator":["Nguyen, Linda T. (Linda Thi)"],"dc:date.accessioned":["2010-10-12T18:59:46Z"],"dc:date.available":["2010-10-12T18:59:46Z"],"dc:date.issued":["2010"],"dc:description":["Thesis (S.M. in System Design and Management)--Massachusetts Institute of Technology, Engineering Systems Division, 2010.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 86-87)."],"dc:description.abstract":["This work investigates the overload problems of one product development department in a consumer products company. Many in the organization attribute the problem to an external source - a burgeoning product portfolio. The most common solution posed is to split the department into two in order to reap the productivity gains of specialization and reduce the overload. It is proposed that some of the overload is internally generated and specialization alone will not be enough. There is a Reinventing the Wheel phenomenon that occurs when projects are handed off from one person to another. Additional work is generated with each hand off. This problem can be exacerbated by high turnover, lack of documentation, switch loss, or delays in project completion. System dynamics models were created to explore the feedback loops, delayed effects of managerial decisions and resulting behavior of the system. Results showed that specialization leads to initially high productivity, but the gains decrease over time as breadth of experience across the organization decays and rework and coordination costs increase. It is also shown that overload could be internally generated through managerial policies. If these policies are not changed, specializing may not be as effective. Recommendations include considering turnover as part of project planning and carefully monitoring workload so that the productivity does not plummet and affect all programs. Specialization is a good solution in some cases, but is not the best solution for work that requires a great deal of interaction between functions, where the level of coordination required to share knowledge outweighs the productivity gains."],"dc:description.degree":["S.M.in System Design and Management"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/59260"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Engineering Systems Division.","System Design and Management Program."],"dc:title":["Is specialization the most effective solution to overload? : a system dynamics exploration of a product development organization"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:21:20Z"}