Back to results

Massachusetts Institute of Technology

Product-level Bill of Material Development Methodology : process implementation

Abstract

dc:description.abstract

Cisco Systems maintains its leading position in the IP network equipment market through continual innovation and release of new products. In order to manage these new product introductions, the Product Operations group enables the development engine by standardizing and refining operations processes. The Bill of Materials Development Methodology (BOM DM) is a new process created to reduce BOM structuring errors and lead to an improved fulfillment experience for Cisco customers. In keeping with the Six Sigma philosophy, the BOM DM implementation team used the Define-Measure-Analyze-Implement-Control (DMAIC) approach to manage this process but struggled to find the supporting data to appropriately measure critical process parameters or quantify the impact of the solution. After re-evaluation, the approach was modified to maintain the Six Sigma mindset but abandon much of the rigor of DMAIC such that the implementation could be completed within the required timeframe and available resources. This required a new process improvement strategy that would educate the New Product Introduction (NPI) teams on the downstream consequences of their actions so that they would buy in to the need for a standardized best practice. The BOM DM was incorporated into the product development standards and each functional group was given the option to adopt. Six months later the project was reviewed to understand its effect on the company. This thesis serves as a case study of the issues faced on many DMAIC implementations in the real world that experience less than perfect execution. Though sacrificing the confidence that is supported by statistically significant measurement and analysis, the revised approach utilized for the BOM DM implementation leveraged two of Cisco's prized endowments: speed and a creative entrepreneurial spirit. The goal of this thesis is to uncover the tradeoffs of such a compromise and empower managers to decide how best to engage in future process improvements.

Degree

thesis:*
Department dc:contributor.department
Leaders for Global Operations Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2010

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Black, James William
Advisor dc:contributor.advisor
  • Christopher L. Magee and Sara L. Beckman.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/59153
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/59153

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Black, James William. Product-level Bill of Material Development Methodology : process implementation. Massachusetts Institute of Technology, 2010. http://hdl.handle.net/1721.1/59153