Back to results

Massachusetts Institute of Technology

Optimizing paint blocking in an automobile assembly line : an application of specialized TSP's

Abstract

dc:description.abstract

In the automobile manufacturing industry, vehicle production is an assembly-line process. Automobile companies typically sequence vehicle production based on workload balancing factors, with little consideration of vehicle colors. The resulting sequence usually has a small average paint block size. Because automobile manufacturers use expensive and sometimes pollutant chemicals to clean out old paint at each color change, they would like to increase the size of the paint blocks, while maintaining the original workload-balanced vehicle sequence. To achieve this goal, Ford and other automobile manufacturers are considering automated vehicle storage and retrieval systems that would allow them to perturb the original sequence around the vehicle painting station, creating larger paint blocks and then restoring the original sequence after painting. To evaluate these systems, it is necessary to develop a method for re sequencing cars and for calculating the resulting savings in paint cleanings. The problem of resequencing can be cast as a traveling salesman problem with time windows. For a real-life sequence size of 750 cars and windows of 75 slots per car in either direction, direct modeling using the strongest known ... formulation yields an integer program with up to 200,000 constraints and 14,000,000 variables. Reduced formulations. We exploit special problem structure to solve the LP relaxation of this problem quickly using Lagrangean relaxation. We prove and use an order-within-color property to construct an enumerative formulation, and use a greedy approach to bound the LP optimum. We decompose the problem and solve smaller enumerative formulations sequentially to generate a heuristic solution that empirically is within 2.5% of optimality. Because our heuristic and bounding procedure runs in a total of one minute, an automobile manufacturer could use the process to adjust the resequencing process in real time to compensate for vehicles that have been delayed in the original sequence due to production defects or other disruptions. We also establish worst-case bounds ranging from 2.5 to 6 for another related heuristic.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Operations Research Center
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
1999

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Sokol, Joel Scott, 1971-
Advisor dc:contributor.advisor
  • Thomas L. Magnanti.

Subjects

dc:subject × 2

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/58514
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/58514

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Sokol, Joel Scott, 1971-. Optimizing paint blocking in an automobile assembly line : an application of specialized TSP's. Massachusetts Institute of Technology, 1999. http://hdl.handle.net/1721.1/58514