Massachusetts Institute of Technology
Head & base production optimization : setup time reduction
Abstract
dc:description.abstractAt Schlumberger, the make-to-order strategy and number of Head & Base product types (about 1000 types) requires a flexible manufacturing system in which the machine setup is frequent. However, the lengthy CNC machine setup time in the Head & Base machining station directly affects the manufacturing capacity. This research implements Single Minute Exchange of Die (SMED) methodology and proposes a set of solutions, such as manufacturing sequence optimization, setup sequence optimization, setup operation simplification, etc, to reduce setup time without sacrificing quality. Most of the solutions have been implemented and the result is significant and impressive, the overall setup time has been reduced by up to 40 percent and the expected cost saving is about 50,000 USD.
Degree
thesis:*- Department dc:contributor.department
- Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
- Grantor dc:publisher
- Massachusetts Institute of Technology
- Year dc:date.issued
- 2009
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Guo, Haiqing
- Advisor dc:contributor.advisor
-
- Kamal Youcef-Toumi.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
- Licence dc:rights.uri
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1721.1/55215
- OAI identifier oai:identifier
- oai:dspace.mit.edu:1721.1/55215