A real options analysis of Olympic Village development : how design flexibility adds value

Abstract

dc:description.abstract

This thesis applies past research on real options - a right, but not an obligation to take some action on a real asset in the future - to a very specific type of real estate development related to Olympic Village development. The Olympics have been previously criticized for the excessive cost of preparation for the 16 or 17 day event. Chicago, if selected to host the 2016 Summer Games, could be faced with many of the same challenges of past cities. The purpose of this thesis is not to provide the final answer to whether a developer should implement design flexibility into a project like the Chicago Olympic Village, but rather provide a tool for which to analyze the project and areas of uncertainty. Real Options Analysis (ROA) is presented as a set of specific steps that correlate with more commonly used methods of real estate valuation. In order to determine the optimal sources for flexibility, qualitative research identifies challenges and uncertainties of Olympic Village development. This data is reviewed, analyzed and used to illustrate potential sources of flexibility for further analysis. ROA introduces the use of Monte Carlo simulation to better forecast the range of expected outputs and then integrates flexibility at various decision points of the project. The results of this model should allow decision makers for a project to choose the most desired path based on the goals and requirements of the project. It is observed, based on the assumptions used for this analysis, that flexibility "in" and "on" the project does create additional value, however this additional value is partially offset by the cost of the flexibility, if applicable.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Center for Real Estate. Program in Real Estate Development.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2009

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Martinson, Robert J., S.M. Massachusetts Institute of Technology
Advisor dc:contributor.advisor
  • David Geltner.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/54860
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/54860

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Martinson, Robert J., S.M. Massachusetts Institute of Technology. A real options analysis of Olympic Village development : how design flexibility adds value. Massachusetts Institute of Technology, 2009. http://hdl.handle.net/1721.1/54860