Back to results

Massachusetts Institute of Technology

Real time dispatching control in transit systems

Abstract

dc:description.abstract

Maintenance of reliable service is a goal of any rail transit agency. Reliability is difficult to maintain due to the perturbations that serve to disrupt headway sequences. These incidents that affect the service quality of transportation agencies can be categorized into two types, major disruptions and minor disturbances, based on their nature and causes. To maximize the capacity of a rail transit line and avoid busing, single track operation is analyzed in this thesis to deal with major disruptions. Based on the tracks and crossover configuration of the Massachusetts Bay Transportation Authority Red Line, a full analysis of possible strategies is presented which might form the basis for a major disruption response system. This could take the form of pre-planned short term operation plans which would be geared to the type, location and time of day of the disruption. The dispatching problem occurs around a terminal when a train is not expected to arrive at the terminal early enough to be dispatched on its next trip on schedule. This problem can be considered as a special case of minor disturbance. Its solution can also supply insight into the more general minor disturbance problem. We use holding and short turning as our control strategies to deal with the dispatching problem. Choosing minimizing passenger waiting time or the number of overcrowded trains as the objective, a heuristic dispatching control model is designed and evaluation and simulation models are used to estimate and compare the effectiveness of the current dispatching system and the heuristic dispatching control model. The results show that the heuristic dispatching control model could produce savings in average passenger waiting time of up to 14%, with the effectiveness increasing as the disruption becomes more severe. As part of this research, a dwell time model is estimated for Red Line trains in order to predict the running time of a train to help select the appropriate control strategy.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
1998

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Song, Wei, 1970-
Advisor dc:contributor.advisor
  • Nigel H.M. Wilson.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/50512
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/50512

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Song, Wei, 1970-. Real time dispatching control in transit systems. Massachusetts Institute of Technology, 1998. http://hdl.handle.net/1721.1/50512