Back to results

Massachusetts Institute of Technology

Mitigating the risk of a new workforce by reducing rework and rightsizing on hand inventory

Abstract

dc:description.abstract

Dramatically increasing the hourly workforce at a rapid pace to support accelerated product demand in an aircraft manufacturing facility in a short amount of time resulted in: (1) increased rework, and (2) increased part damage during assembly. The majority of rework results from simple workmanship mistakes from the new workforce. The approach used in this thesis to combat the increase in rework involves the design and implementation of a feedback loop on the shop floor of a leading aircraft manufacturer. The loop consists of providing each worker with a list of their discrepant work from the day before and the opportunity for them to perform their own rework. The thesis shows that the percent of discrepancies reworked by the original mechanic increases from 27% to 41%. Paired data is analyzed to show (on average) a 20% decrease in rework when the feedback loop is utilized. Included is qualitative advice on implementing change on the shop floor. During final testing, damaged parts (typically as a result of out of sequence work or workmanship mistakes) are discovered and require immediate replacement. Frequently, there are no replacement parts available at the test site, since the original part was installed by a subcontractor. To meet the immediate replacement need, test personnel remove an already installed part from an aircraft upstream in final assembly at the same location. The thesis includes a case study to demonstrate a binomial demand model to estimate the amount of on hand safety stock required to prevent the unnecessary labor from the redundant part removal and replacement from upstream aircraft.

Degree

thesis:*
Department dc:contributor.department
Leaders for Manufacturing Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2009

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Larson, David (David William)
Advisor dc:contributor.advisor
  • Deborah Nightingale and Stephen C. Graves.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/49777
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/49777

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Larson, David (David William). Mitigating the risk of a new workforce by reducing rework and rightsizing on hand inventory. Massachusetts Institute of Technology, 2009. http://hdl.handle.net/1721.1/49777