Massachusetts Institute of Technology
Strategic and operational plan for better material handling
Abstract
dc:description.abstractCurrently the material handling in NPC Singapore is done manually via forklift trucks. As the production volume increases and a new product launches, the current capacity will not be sufficient for 2012. In order to avoid the production loss and increase the operational efficiency, four solutions have been tested, including forklift trucks and labor extension, Kanban redesign in staging areas, conveyor implementation in staging areas and automating the transportation between the warehouse and production via implementing AGVs or transfer cars. In this thesis research we specifically analyze the use of AGVs and transfer cars. By implementing two transfer cars in 2012, the system capacity will remain adequate until 2018. This investment provides a $364,165 net present value and a 29% internal rate of return.
Degree
thesis:*- Department dc:contributor.department
- Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
- Grantor dc:publisher
- Massachusetts Institute of Technology
- Year dc:date.issued
- 2008
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Zhao, Changhui
- Advisor dc:contributor.advisor
-
- Stephen C. Graves.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
- Licence dc:rights.uri
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1721.1/46544
- OAI identifier oai:identifier
- oai:dspace.mit.edu:1721.1/46544